Chapter 22-12.1 Making Pre-Checks2.1.1 Selecting the Site of Installation 0007-4754iR2270 / iR2870 / iR3570 / iR4570 / / / /Select the site of installation against the following requirements; if possible, visit the user's before delivery of the machine:1) There must be a power outlet properly grounded and rated as indicated (+, -10%) for exclusive use by the machine.2) The environment of the room must be as indicated in the following diagram, and the machine must not be installed near a water faucet, water boiler, humidifier,or refrigerator:F-2-13) The machine must not be installed near a source of fire or in an area subject to dust or ammonium gas.If the area is exposed to direct rays of the sun, provide curtains to the window.4) The room must be well ventilated. (The level of ozone generated by the machine in use will not affect the individuals around it. However, some may find its odorto be unpleasant, as when working in a poorly ventilated room.)5) The floor of the machine must be level so that the feet of the machine will remain in contact and the machine will remain level.6) The machine must be at least 10 cm away from any wall, permitting unobstructed use.- Without a Finisher or Side Paper Deck-P1 InstalledF-2-2- With a DADF-N1, Finisher S1, and Side Paper Deck-Q1 InstalledF-2-3- With a DADF-N1, Side Paper Deck-Q1, Saddle Finisher-Q4, Buffer Path Unit-E1, and Puncher Unit-L1/M1/N1/P1 InstalledHumidity (%RH)80604020100 10 15 20 27.5 30(32) (50) (59) (68) (81.5)(86)Temperature75251,035 mm100 mm min.1,158 mm1,087 mm1,228 mm1,371 mm1,553 mm100 mm min.1,015 mm182 mm