Chapter 22-92.1.8 Order of Installing Accessories 0011-6504iR7105 / iR7095 / iR7086If you are planning to install other accessories also, go through the following in the order indicated:1. side paper deck [1] (See the Side Paper Deck Installation Procedure.)2. high-capacity stacker [2] (See the High-Capacity Stacker Installation Procedure.)3. finisher [3]/saddle finisher [4] (See the "Preparing the Finisher" in Finisher/Saddle Finisher Installation Procedure.)4. finisher accessories power supply unit [5] (See the Finisher Accessories Power Supply Unit Installation Procedure.)5. punch unit [6]* (See the Punch Unit Installation Procedure.)6. paper folding unit [7] (See the Paper Folding Unit Installation Procedure.)7. perfect binder [8]* (See the Perfect Binder Installation Procedure.)8. professional puncher [9]* (See the Professional Puncher Installation Procedure.)9. inserter [10] (See the Inserter Installation Procedure.)10. trimmer [11] (See the Trimmer Installation Procedure.)* The punch unit [6] and the professional puncher unit [9] cannot be installed as part of the same system.The perfect binder [8] and the professional puncher unit [9] cannot be installed as part of the same system.F-2-9[1][2][4][3][7][10][6][9][8][11][5]