Chapter 77-8F-7-87.3 Basic Sequence7.3.1 When Turning the Power ON 0012-6528imagePRESS C1 P / imagePRESS C1In case of turning on the main power switch when the temperature of the fixing roller surface is under 50 deg C. (when turning on the main power switch afterleaving it for a long time, e.g., in the morning)1. Feature- Right after starting the sequence, execute the HP detection of the developing rotary and eliminate static from the drum surface.- The approximate time required from turning on the main power switch to being the standby state is about 9min 10sec. (max. time is less than 11min 40sec)- During the warm-up rotation, the following controls are executed:Wire cleaning, potential control, primary/secondary transfer ATVC control, ITB cleaner ACVC control, ATR patch control, development idle rotation control,D-half control *1*1: Execute the control if there is the history of more than 500 sheets color printing, or when the environment is changed.4. Fixing Block3.Transfer Block1.Electrostatic Latent Image Formation BlockDelivery [9]RegistrationPickupITBPhotosensitive Drum[7][11]5. ITB CleaningBlock[10][8][4] 7.PhotosensitiveDrum Cleaning Block2.DevelopingBlock [12][5][1][3][2][6]6.Cleaning Blockof SecondaryTransfer Block