6F2S1931 (0.20)Centralized GRB200(Soft: 030, 031, 032, 033, 034)- 717 -Cautions(i) Safety PrecautionsCAUTION The IED rack is provided with a grounding terminal.Before starting the work, always make sure the IED rack is grounded. When connecting the cable to the back of the IED, firmly fix it to the terminal blockand attach the cover provided on top of it. Before checking the interior of the IED, be sure to turn off the power. Class 1 laser.Failure to observe any of the precautions above may cause electric shock or malfunction.(ii) Cautions on TestsCAUTION While the power is on, do not connect/disconnect the flat cable on the front of theprinted circuit board (PCB). While the power is on, do not mount/dismount the PCB. Before the power is on, check the following:- Make sure the polarity and voltage of the power supply are correct.- Make sure the CT circuit is not open.- Make sure the VT circuit is not short-circuited. Transformer module is damaged due to an overcurrent or overvoltage. Clear test settings after the test; then, set original settings again.Failure to observe any of the precautions above may cause damage or malfunction of the relay.Before mounting/dismounting the PCB, take antistatic measures such as wearing an earthedwristband.PreparationsTest equipmentThe following test equipment is required for the commissioning tests.1 Three-phase voltage source2 Single-phase current sources1 Dynamic three-phase test set (for protection scheme test)1 DC power supply3 DC voltmeters3 AC voltmeters3 Phase angle meters2 AC ammeters