6F2S1931 (0.20)Centralized GRB200(Soft: 030, 031, 032, 033, 034)- 701 -simulation test. This does not start the simulation.The setting menu is shown in the manner of the screen illustrated in Figure 11.8-7,if the user needs to configure an Input Circuit other than BI01 (BI02 to BI18 in thescreen shown in Figure 11.8-6); the user can configure each BI signal in a mannersimilar to that described for BI01.After selecting OP in Figure 11.8-6, use the following screen to start the simulationtest.Figure 11.8-8 Execution menu of BI testIf key ENTER is pressed in Figure 11.8-8, the status will change to test status. Thefollowing screen will be displayed after pressing the key ENTER. Figure 11.8-9shows that the IED is in simulation test mode.Figure 11.8-9 Running test menuNote: The user has to continue to depress the key ENTER on the IED front panel duringthe simulation test period. The simulation status will be released if key ENTER isnot pressed.Binary output test screen: The user is able to test a binary output circuit.Figure 11.8-10 is an example of how to select a binary output from the TestMode screen.Slot#310:48Press and hold ENTERto operatePress <- to returnTo previous pageSlot#310:48Press and hold ENTERto operateOperating..Press <- to returnTo previous page