8© 2008 - 2011 TOSHIBA TEC CORPORATION All rights reserved e-STUDIO2020C/2330C/2820C/2830C/3520C/3530C/4520CFIRMWARE UPDATING8 - 41(8) Connect the 15-pin side of the harness jig for board connection to the connector (CN15) of thefinisher control PC board.Fig. 8-36Notes:• Be sure to release the connection cable from the connector (CN15) of the finisher control PCboard when the hole punch unit (MJ-6101) has been installed.• Be careful not to short-circuit any part of the converter PC board.(9) Connect the download jig with the jig connector (CN9) on the Finisher control board.Fig. 8-37(10) Press the [ON/OFF] button while simultaneously holding down the [0] and [8] buttons.Updating starts and the LED on the download jig lights.(11) When the update completes normally, the LED on the download jig starts blinking.The LED on the download jig starts blinking approx. 20 seconds after the update started.It is assumed that the update has failed if the LED does not start blinking even after 30 secondshave elapsed. In this case, shut down the equipment and check the following items. Then clearthe problems and restart updating from the beginning.• Is the downloading jig connected properly?• Is the ROM attached to the downloading jig properly?• Have the update data been written correctly to the ROM on the jig?• Is the download jig or the equipment damaged?• Is the harness jig for board connection connected to connector (CN2) of the converter PCboard and the connector (CN15) of the finisher control PC board correctly?CN15Download jig