August 20072-400 WorkCentre 5687 Family11-100-130Status Indicator RAPs11-100-130 HCSS Paper Entry RAP11-100-130 The leading edge of the sheet is late to the HCSS.Initial ActionsCheck for the following:• Obstructions in the paper path before the entry to the HCSS.• Obstructions around the diverter gate.• Damage to the diverter gate.• The HCSS is securely docked to the machine.• The HCSS is correctly aligned with the machine, refer to ADJ 11.1-130 Machine to HCSSAlignment.ProcedureNOTE: All HCSS interlocks must be made to supply +24V to the motors.Enter dC330, code 11-100. Actuate the entry sensor, Q11-100, Figure 1. The displaychanges.Y NGo to Flag 1. Check the sensor Q11-100.Refer to:• GP 11, How to Check a Sensor.• P/J420, HCSS PWB.• 11C-130 HCSS Power Distribution RAP.Install new components as necessary:• Entry sensor Q11-100, PL 11.38 Item 9.• HCSS PWB, PL 11.56 Item 5.Enter dC330, code 11-000, transport motor 1A. The motor runs, Figure 1.Y NGo to Flag 4. Check transport motor 1A.Refer to:• GP 10, How to Check a Motor.• P/J425, HCSS PWB.• 11C-130 HCSS Power Distribution RAP.Install new components as necessary:• Transport motor 1A, PL 11.38 Item 5.• HCSS PWB, PL 11.56 Item 5.Enter dC330, code 11-000, transport motor 1B. The motor runs, Figure 1.Y NGo to Flag 3. Check transport motor 1B.Refer to:• GP 10, How to Check a Motor.• P/J419, HCSS PWB.• 11C-130 HCSS Power Distribution RAP.Install new components as necessary:• Transport motor 1B, PL 11.38 Item 5.• HCSS PWB, PL 11.56 Item 5.Enter dC330, code 11-002, diverter solenoid, SOL11-002. The solenoid energises.Y NGo to Flag 2. Check the diverter solenoid, SOL11-002.Refer to:• GP 12, How to Check a Solenoid or Clutch.• P/J421, HCSS PWB.• 11C-130 HCSS Power Distribution RAP.Install new components as necessary:• Diverter solenoid SOL11-002, PL 11.36 Item 3.• HCSS PWB, PL 11.56 Item 5.Perform SCP 6 Final Actions.Figure 1 Component locationEntry sensor,Q11-100Transport motor 1A,MOT11-000Transport motor 1B,MOT11-000Diverter solenoid SOL11-002AA