August 20072-109WorkCentre 5687 Family 05-300Status Indicator RAPs05-300 DADH Open RAP05-300 The DADH closed switch detects that the DADH is open during run.Initial ActionsCheck that the DADH magnet is installed and aligned correctly. Refer to Figure 1 (32-55 ppm)or Figure 2 (65-87 ppm).NOTE: The DADH has two magnets. On 32-55 ppm machines, the center magnet activatesthe DADH closed switch, refer to Figure 1. On 65-87 ppm machines, the left magnet activatesthe DADH closed switch, refer to Figure 2.ProcedureWARNINGSwitch off the electricity to the machine, GP 14. Disconnect the power cord from thecustomer supply while performing tasks that do not need electricity. Electricity cancause death or injury. Moving parts can cause injury.NOTE: (32-55 ppm) To get access to the bulkhead connector, remove the user interfaceassembly, PL 2.15 Item 1. To get access to the DADH closed switch, remove the top cover, PL14.20 Item 3, from the scanner module. To get access to the scanner PWB, remove the docu-ment glass, PL 14.20 Item 5 and the scanner PWB cover, PL 14.25 Item 1.NOTE: (65-87 ppm) To get access to the bulkhead connector, remove the user interfaceassembly, PL 2.10 Item 1. To get access to the DADH closed switch, remove the top cover, PL14.10 Item 3, from the scanner module. To get access to the scanner PWB, remove the docu-ment glass, PL 14.10 Item 5 and the scanner PWB cover PL 14.16 Item 9.Enter dC330 code 05-300 to check the DADH closed switch, S05-300. Open and close theDADH. The display changes.Y NGo to Flag 1. Check S05-300.References:• GP 13 How to Check a Switch.• P/J453 and the bulkhead connector.• 01D +3.3V Distribution RAP.• The 3.3V return in the 01B 0V Distribution RAP.Install new components as necessary:• DADH closed switch (32-55 ppm), PL 14.25 Item 6.• DADH closed switch (65-87 ppm), PL 14.16 Item 5.• Scanner PWB (32-55 ppm), PL 14.25 Item 4.• Scanner PWB (65-87 ppm), PL 14.16 Item 8.Perform the steps that follow. Install new components as necessary:• Check that S05-300 is installed correctly.• Check the DADH frame for distortion, go to ADJ 5.2. If the DADH frame is distorted, installa new DADH, PL 5.10 Item 9.Figure 1 Component location (32-55 ppm)Figure 2 Component location (65-87 ppm)MagnetDADH closedswitchS05-300BulkheadconnectorMagnetDADH closedswitchS05-300Bulkheadconnector