40Startup of OpenPort PLATFORMThis unit is equipped with the OpenPort PLATFORM system based on Android.Set the input select to OpenPort PLATFORM for using. (see page 37)StartupThe startup processing of the OpenPort PLATFORM system is performed when the unit starts up while the powerindicator is off (power-off status) or lighting in red (standby status).The startup screen appears while the unit is starting up in the OpenPort PLATFORM input selection status.Note● Approx. 40 seconds for startup. When starting up for the first time, approx. 70 seconds are taken.● When [Options] - [Startup logo] is set to [On], this is displayed followed by the Panasonic logo. (see page 94)● When the power indicator is lighting in orange (standby or sleep status), the OpenPort PLATFORM system isoperating. When the unit starts up in this status, the startup screen does not appear.● When OpenPort PLATFORM cannot respond for some reason, it is restarted automatically and then the recoveryprocessing is performed.ShutdownThe shutdown processing of the OpenPort PLATFORM system is performed either when the power is turned off usingthe or the power is turned off using the remote control, etc. when [Setup] - [OpenPortPLATFORM standby] is set to [Off] (see page 83).During shutdown process, the power indicator lights up in orange from green illumination, the message [Shutting downOpenPort PLATFORM. Please wait.] appears.Note● Approx. 30 seconds for shutdown.● While the OpenPort PLATFORM system is shutting down, the remote control operation or external controlcommands are not accepted.● When the unit is in standby status (Power Indicator: Red) by shutting down the OpenPort PLATFORM system, thewired LAN or wireless LAN networks are cut, and the power can be turned on only by the following operations. (Thepower cannot be turned on by [Setup] - [Set up timer] as well. (see page 85))• Power-on by the power button of remote control• “PON” command reception from the SERIAL terminalForcibly shutting down the OpenPort PLATFORM system[TOOLS] - [Shutdown] (see page 61)[OpenPort PLATFORM Shutdown] (see page 112)