3COM Security Switch 6200 Hardware and Software Users Guide 2-5InstallationTerminal or PCA VT-100 terminal or a Personal Computer (PC) is required duringinstallation. The terminal or PC is connected to the chassis’s craft port,allowing you to monitor start-up diagnostics and to configure the unit forremote management access.Chassis RackInstallationThe chassis can be installed in the front or center of a standard 19” rack.Front RackMountingTo install the chassis in the front of your rack:1. Remove the center brackets (one on each side) from the system.2. Position the chassis in the rack by aligning the holes on its integratedfront mounting brackets with the holes in the rack.3. Insert the appropriate screws through the brackets and tighten. Ifthe rack holes are not threaded, use cage-nuts over them. Figure 2-2shows a chassis installation example.Figure 2-2 Front Rack Mounting the ChassisFrontMountingBracketRearMountingBracketFIBER 10/100/100010/100CONSOLE(max) 9800,8,N,1PACKETLINK13572468911131510121416FIBERPACKETLINK1718PWRMGMT1MGMT2SYSHDD