• Make sure that all internal cables are correctly routed. See Chapter 6 “Internal cable routing” on page 281.• Handle the top cover carefully. Dropping the top cover with the cover latch open might damage the coverlatch.ProcedureFigure 247. Installing the top coverStep 1. Ensure that the cover latch is in the open position. Lower the top cover onto the chassis until bothsides of the top cover engage with the guides on both sides of the chassis. Then, slide the topcover to the front of the chassis.Note: Before you slide the top cover forward, ensure that all the tabs on the top cover engage withthe chassis correctly.Step 2. Rotate the cover latch until the top cover snaps into position. Ensure that the cover latch iscompletely closed.Step 3. Use a screwdriver to turn the cover lock to the locked position.Demo videoWatch the procedure on YouTubeComplete the parts replacementGo through the checklist to complete parts replacementTo complete the parts replacement, do the following:1. Ensure that all components have been reassembled correctly and that no tools or loose screws are leftinside your server.Chapter 5. Hardware replacement procedures 279