Nlav 31. 2012 9:IBAM No. 1530 0 1/\Page 16 INSTALLATIONConneated Felition - ln thia position, thecircuit breaker prim6ry disconnect bus stabsafs conn€ctod to rhe switchgeal bus bars.ln moving the circuit br€akdr from rhe T€stPo€idon to trr€ Connccted Position:1) First cheak to mak6 Eur6 th6 open-closadindicator reads "OPEI{' (green).Flre and erdoSlon hazard.Trip circuit br€3kar opin b€fors attempdrig torack llre citcuit beaker |trto tte Conn€ct€dPosldon,2) Lift the ifierlock levar.3l Ineen the racking handle as $hown inFig. 27.4l Turn the handle clockwise (Fig. 28). Thecirouit breaker will move inward,5l Stop rotating the tacking hsndle when theraoking scr6w thread h€s cleared theracking nw, You will heer e click sound aeth6 arrow at the lower paft of the cirouitbrsaker comes in line whfi the red line ofthe Connected Position hdicating plal6 ontha cell floor {Fig. 29}.Remove the racking nandle.Check to verify rha intedock lerrer hasdropped completely.Fig" 26 Gripping Circuit Bresker HEndles6)7lFis. 25 Lifting htarlock LeverFlA. 27 lnsening Backing Handle