D25User's Manual GE Grid Solutions18 994-0081-3.00-21 GE InformationChapter 2: Installing the D25Installation Tools ListInstallationTools ListBefore you begin the install of the D25, gather the following:• A Flat Screwdriver with 0.6x3.5 mm blade (for terminal block wiring)• A #2 Phillips Screwdriver (for rack mounting the unit)• Wire Cutters• Wire Strippers• Wire Crimping Tool• Tie-wraps (for gathering extra wire)• Multi-meter (for testing points)Installation StepsProcedure Follow these steps to install the D25:Step Action1 Unpack the D25.2 Using the First Look at the D25 section of this guide, inspect the D25for damage.Note: Report any damage immediately to GE Grid Solutions. See:Product Safety for contact details.3 Loosen the D25 front panel and remove the battery “PULL” tabs (onefor the Mainboard battery, and one for the optional MemoryExpansion card battery). The D25 is delivered with these tabs inplace to insulate the battery during shipment.4 Install the D25. Follow the procedure set out in section: ConnectingField Wiring.5 Carry out all field wiring connections and jumper settingsconfiguration as set out in section: Configuring the D25 to work witha DNP3 I/O Module:• Power• Serial and Ethernet communication• Input and output pinouts6 Power-up the D25 and check for normal operation. See section:Configuring the D25 to work with a DNP3 I/O Module. Some testingrequires that code and configuration files have been downloaded tothe D25.If the front panel Power and Run LEDs do not show normaloperation, then use WESMAINT to inspect the error messages fromthe self-diagnostics and ascertain what is malfunctioning.