U-Line ECHELON CLR2060 manuals
ECHELON CLR2060
Brand: U-Line | Category: Refrigerator
ECHELON CLR2060
Brand: U-Line | Category: Refrigerator
ECHELON CLR2060
Brand: U-Line | Category: Refrigerator
Table of contents
- Table Of Contents
- Table Of Contents
- General Information
- Limited Warranty
- Warranty Claims Procedure
- Proof of Purchase
- Parts Listing
- Safety Precautions
- Échelon™ Door Adjustment
- general information
- Screening Calls
- screening calls
- Compressor/Electrical Specifications
- U-Line Frost Free Refrigeration System
- Typical Frost Free Airflow Configuration
- Refrigeration System Diagnosis Guide
- CO2075FF and U-CO29FF Ice Maker Operation
- Ice Maker Diagnosis Flow Chart
- Troubleshooting
- Disassembly Procedures
- Replacing Ice Maker Assembly
- Replacing Mold and Heater
- U-CO29FF Wiring Diagram
- RF Wiring Diagram
- Model U-CO29FF & Icemaker
- R/2015R Models
- Refrigeration System
- R/2015R Wiring Diagram
- WC/2015WC Models
- WC/2015WC Wiring Diagram
- BI • 2015 Model
- Temperature Control Specifications
- Limit Switch Specifications
- Refrigeration System-Normal Vapor
- Ice Maker Operating Cycles
- BI • 2015 Cycle Schematics
- water fill cycle
- BI • 2015 Replacing Ice Maker Assembly
- BI • 2015 Replacing Mold and Heater
- BI • 2015 Wiring Diagram
- CLR2060 Model
- Leveling and Installation Requirements
- Gravity Drain Installation
- Connecting a Drain Pump
- Automatic Clean Cycle Instructions
- Sequence of Operation
- Thermistor
- New CLR2060 Control Board Design
- Low Side Pressure Changes
- Ice Thickness Adjustment
- Ice Production Rates
- CLR2060 Wiring Diagram
ECHELON CLR2060
Table of contents
- INTRODUCTION
- Table Of Contents
- SAFETY PRECAUTIONS
- INSTALLATION DIMENSIONS
- CONNECTING A DRAIN PUMP
- SITE PREPARATION
- CONNECTING THE WATER SUPPLY
- LEVELING THE UNIT
- REVERSING THE DOOR
- DOOR ADJUSTMENT
- CUSTOM DOOR PANELS
- BUILT-IN INSTALLATION
- INITIAL START-UP
- NORMAL OPERATION
- OUTDOOR USE
- MAINTENANCE
- STORAGE, VACATION AND MOVING
- TROUBLESHOOTING
- IF SERVICE IS REQUIRED
ECHELON CLR2060
Table of contents
- INTRODUCTION
- Table Of Contents
- SAFETY PRECAUTIONS
- INSTALLATION DIMENSIONS
- CONNECTING A DRAIN PUMP
- SITE PREPARATION
- CONNECTING THE WATER SUPPLY
- LEVELING THE UNIT
- REVERSING THE DOOR
- CUSTOM DOOR PANELS
- BUILT-IN INSTALLATION
- INITIAL START-UP
- NORMAL OPERATION
- MAINTENANCE
- STORAGE, VACATION AND MOVING
- TROUBLESHOOTING
- IF SERVICE IS REQUIRED