OneStart

OHAUS PA64 Service Manual

Also see for Carat PAJ1003: Instruction manual

Page 1 preview
Page 2 preview
Page 3 preview
Page 4 preview
Page 5 preview
Page 6 preview
Page 7 preview
Page 8 preview
Page 9 preview
Page 10 preview
Page 11 preview
Page 12 preview
Page 13 preview
Page 14 preview
Page 15 preview
Page 16 preview
Page 17 preview
Page 18 preview
Page 19 preview
Page 20 preview
Page 21 preview
Page 22 preview
Page 23 preview
Page 24 preview
Page 25 preview
Page 26 preview
Page 27 preview
Page 28 preview
Page 29 preview
Page 30 preview
Page 31 preview
Page 32 preview
Page 33 preview
Page 34 preview
Page 35 preview
Page 36 preview
Page 37 preview
Page 38 preview
Page 39 preview
Page 40 preview
Page 41 preview
Page 42 preview
Page 43 preview
Page 44 preview
Page 45 preview
Page 46 preview
Page 47 preview
Page 48 preview
Page 49 preview
Page 50 preview
Page 51 preview
Page 52 preview
Page 53 preview
Page 54 preview
Page 55 preview
Page 56 preview
Page 57 preview
Page 58 preview
Page 59 preview
Page 60 preview
Page 61 preview
Page 62 preview
Page 63 preview
Page 64 preview
Page 65 preview
Page 66 preview
Page 67 preview
Page 68 preview
Page 69 preview
Page 70 preview
Page 71 preview
Page 72 preview
Page 73 preview
Page 74 preview
Page 75 preview
Page 76 preview
Page 77 preview
Page 78 preview
Page 79 preview
Page 80 preview
Page 81 preview
Page 82 preview
Page 83 preview
Page 84 preview
Page 85 preview
Page 86 preview
Page 87 preview
Page 88 preview
Page 89 preview
Page 90 preview
Page 91 preview
Page 92 preview
Page 93 preview
Page 94 preview
Page 95 preview
Page 96 preview
Page 97 preview
Page 98 preview
Page 99 preview
Page 100 preview
Page 101 preview
Page 102 preview
Page 103 preview
Page 104 preview
Page 105 preview
Page 106 preview
Page 107 preview
Page 108 preview
Page 109 preview
Page 110 preview
Page 111 preview
Page 112 preview
Page 113 preview
Page 114 preview
Page 115 preview
Page 116 preview
Contents
  1. Introduction
  2. Tools and Test Equipment Required
  3. specifications
  4. Balance Operation
  5. Overview of the Display Indicators
  6. Power On
  7. The Load Cell
  8. Connecting the RS232 Interface
  9. RS232 Commands
  10. Troubleshooting
  11. Diagnostic Guide
  12. Error Codes
  13. Preventive Maintenance
  14. Variations in Opening Pioneer Models
  15. Load Cell Removal and Disassembly
  16. Disassembly of Precision Balances with Internal Calibration
  17. Removing Internal Calibration Weights
  18. Reassembling the Internal Calibration Mechanism
  19. Proper manner to grasp Load Cell when removing Weight Arm assembly
  20. Service Fixture, screws and washers for 150g to 310g Precision balances
  21. Precision Load Cell top
  22. Position Sensor Board
  23. Hanger
  24. Magnets must be clean
  25. Service Fixture for 510g to 4100g Precision Load Cell, attached to Hanger
  26. Sideways Motion Stop Plate
  27. When Position Sensor Board shows normal weight, tighten its screws
  28. Removing the InCal Mechanism from InCal Analytical Balances
  29. Bottom Housing with Load Cell, Weight Arms and Weights removed
  30. Re-Installing Internal Calibration Components
  31. Disassembling Analytical Load Cells
  32. Shims are inserted between the Hanger and the Load Cell
  33. Vertical Flexure and screws, Lock Plate, washers, and bushings, removed
  34. Hanger with two screws
  35. Contact Board with 3-wire ribbon cable soldered to it
  36. A screw connects the Contact Board to the Load Cell
  37. Position Sensor PC Board Removal/Replacement/Adjustment - Analytical
  38. Reassembling Analytical Load Cells
  39. Installing the Magnet Half
  40. Insert shims between the Hanger and the Load Cell on both sides
  41. Analytical InCal Load Cell with Top Bracket visible
  42. Block Style Load Cell
  43. Progressive Disassembly of Block Style Load Cells
  44. Internal Calibration Testing
  45. InCal Mechanism Removal
  46. InCal Mechanism Installation
  47. Removing Position Sensor
  48. Removing the Block Style Load Cell from the Base Plate
  49. Installing the Block Style Load Cell on the Base Plate
  50. Removal and Installation of the Block Style Load Cell PC Board
  51. Load Cell PCB-Temperature Sensor-Position Sensor assembly
  52. Removing the Ratio Beam on Block Style Load Cells
  53. Contact Board with cover holder off
  54. Weight Arm Screws and Washers removed
  55. Aluminum Sleeves removed
  56. Installing the Ratio Beam on Block Style Load Cells
  57. Ratio Beam Vane Slotted Area
  58. Installing the InCal Weight Arm
  59. Centering pins in Ratio Beam
  60. Installing the Load Cell PCB-Temperature Sensor-Position Sensor
  61. Position Sensor on the Magnet
  62. Setting the Up/Down Stop Screw on Block Style Load Cells
  63. Test Masses Required
  64. Performance Tests
  65. Off-Center Load Test
  66. Off-Center Load Adjustment for Precision Models
  67. Off-Center Load Adjustment for Analytical Models
  68. Off-Center Load Adjustment for Block Style Models
  69. Repeatability Test
  70. Repeatability Worksheet
  71. Linearity Test
/ 116
Related manuals for OHAUS Carat PAJ1003
OHAUS EB3 Service Manual first page preview
OHAUS EB3 Service Manual
OHAUS T51P Service Manual first page preview
OHAUS T51P Service Manual
OHAUS SCOUT Service Manual first page preview
OHAUS SCOUT Service Manual
OHAUS Pioneer Service Manual first page preview
OHAUS Pioneer Service Manual
OHAUS CKW3R Service Manual first page preview
OHAUS CKW3R Service Manual
OHAUS NV212 Service Manual first page preview
OHAUS NV212 Service Manual
OHAUS SD Series Service Manual first page preview
OHAUS SD Series Service Manual
OHAUS RU-U2 Service Manual first page preview
OHAUS RU-U2 Service Manual
OHAUS Scout Pro Service Manual first page preview
OHAUS Scout Pro Service Manual
OHAUS Scout Pro Service Manual first page preview
OHAUS Scout Pro Service Manual
This manual is suitable for: