4 – Managing SwitchesManaging Switch Stacks4-36 59097-02 BS Date/time and Network Time Protocol (NTP) settings. Refer to ”Setting theDate/Time and Enabling NTP Client” on page 4-16 for more information. Firmware load and activation. Refer to ”Installing Firmware” on page 4-44 formore information. Switch reset. Refer to ”Resetting a Switch” on page 4-16 for moreinformation. Edit zoning configuration. Refer to ”Configuring the Zoning Database” onpage 3-47 for more information. Editing user accounts. Refer to ”Managing User Accounts” on page 4-2 formore information. SNMP configuration. Refer to ”SNMP Configuration” on page 4-33 for moreinformation. Syslog configuration. Refer to ”Syslog” on page 4-36 for more information.Additional stack operations include: Refresh the stack to update the faceplate display with current information forall switches in the stack Select all ports on all switches in the stack Remove a switch from a stack. Choose this option after a switch no longerhas a 10-Gbps link. The switch icon is moved from the stack icon andbecomes a single switch icon in the topology display.4.8.1SyslogThe Syslog dialog enables you to save the log information for the stack to aremote host that supports the syslog protocol. Use the Syslog dialog to enableremote logging for the stack. Refer to ”Remote Logging” on page 4-31 for moreinformation.Figure 4-15. Syslog Dialog