Toshiba Perfecptione Installation And Maintenance Manual
-48” 0RINGER 0I 1ONElBA-ITERYBACK UPOFF-48” 0RINGER 0+5v-0-0-0-o AC POWERFIGURE4-lo-PERCEPTION,,POWERSUPPLYCONTROLSANDINDICATORS4-7INSTALLATiONlNSTRUCTlONSSECTION200-255-204FEBRUARY1992operation. Ensure that AC power to bothcabinets is turned off prior to performingthis procedure.NOTE:A 13mm socket wrench and extension is rec-ommended for ease of expansion cabinetinstallation. Two expansion cabinets can beinstalled.1) Remove and retain the four screws securingthe basic cabinet top cover and lift the coveroff the cabinet (Figure 4-l 1).2) Remove and retain the two screws securingeach of the expansion cabinet side panels.Pull the side panels off.3) Place the four casters on the basic cabinet inthe lock position to ensure cabinet stabilityduring the expansion cabinet installation.4) On both the basic and expansion cabinets,remove and retain two screws securing thecabinets doors. Remove and retain the sixscrews securing the rear panel on each cabi-net.5) Place the expansion cabinet on top of thebasic cabinet, ensuring proper alignment ofthe four mounting holes. Secure in place withfour metric bolts, flat washers and lockwash-ers.6) Reinstall the two side covers on the expansioncabinet and secure in place using four screws(two per side).7) Install the top cover on the expansion cabinetand secure with four screws.8) Connect the intercabinet ground wire in accor-dance with Figure 4-8.9) Route the expansion cabinet ribbon cablefrom J405 in the expansion cabinet throughthe opening provided in the cabinet bottomand connect to the basic cabinet backplane at5402.IO) Remove three screws from the secondarypower supply. From the front of the expansioncabinet, slide the power supply into the rackand secure in place with the three rear screws. |
Related manuals for Toshiba Perfecptione
This manual is suitable for:
Product
Menu
Learn More
Menu
Legal
Menu
Copyright © 2024 OneStart. All Rights Reserved