2.2 Unpacking2.2.1 Pre-installation procedureIntroductionThis section is intended for use when unpacking and installing the robot for thefirst time. It also contains information useful during later re-installation of the robot.Prerequisites for installation personnelInstallation personnel working with an ABB product must:• be trained by ABB and have the required knowledge of mechanical andelectrical installation/maintenance/repair work• conform to all national and local codes.Checking the pre-requisites for installationActionMake a visual inspection of the packaging and make sure that nothing is damaged.1Remove the packaging.2Check for any visible transport damage.NoteStop unpacking and contact ABB if transport damages are found.3Clean the unit with a lint-free cloth, if necessary.4Make sure that the lifting accessory used (if required) is suitable to handle the weightof the robot as specified in: Weight, robot on page 565If the robot is not installed directly, it must be stored as described in: Storage condi-tions, robot on page 586Make sure that the expected operating environment of the robot conforms to thespecifications as described in: Operating conditions, robot on page 597Before taking the robot to its installation site, make sure that the site conforms to:• Loads on foundation, robot on page 57• Protection classes, robot on page 59• Requirements, foundation on page 588Before moving the robot, please observe the stability of the robot: Risk of tipping/sta-bility on page 629When these prerequisites are met, the robot can be taken to its installation site asdescribed in section: On-site installation on page 6310Install required equipment, if any.11Weight, robotThe table shows the weight of the robot.WeightRobot model25 kgIRB 120Continues on next page56 Product manual - IRB 1203HAC035728-001 Revision: N© Copyright 2009-2017 ABB. All rights reserved.2 Installation and commissioning2.2.1 Pre-installation procedure