Chapter 5. Hardware replacement proceduresThis section provides installation and removal procedures for all serviceable system components. Eachcomponent replacement procedure references any tasks that need to be performed to gain access to thecomponent being replaced.Installation GuidelinesBefore installing components in your server, read the installation guidelines.Before installing optional devices, read the following notices carefully:Attention: Prevent exposure to static electricity, which might lead to system halt and loss of data, bykeeping static-sensitive components in their static-protective packages until installation, and handling thesedevices with an electrostatic-discharge wrist strap or other grounding system.• Read the safety information and guidelines to ensure your safety at work:– A complete list of safety information for all products is available at:http://thinksystem.lenovofiles.com/help/topic/safety_documentation/pdf_files.html– The following guidelines are available as well: “Working inside the server with the power on” on page 42and “Handling static-sensitive devices” on page 42.• Make sure the components you are installing are supported by your server.– For a list of supported optional components for the server, see https://serverproven.lenovo.com/.– For the option package contents, see https://thinksystem.lenovofiles.com/help/topic/options/overview_options.html.• For more information about ordering parts:1. Go to http://datacentersupport.lenovo.com and navigate to the support page for your server.2. Click Parts.3. Enter the serial number to view a listing of parts for your server.• When you install a new server, download and apply the latest firmware. This will help ensure that anyknown issues are addressed, and that your server is ready to work with optimal performance. Go tohttps://datacentersupport.lenovo.com/tw/en/products/servers/thinksystem/sr665v3/7d9a/downloads/driver-list/ to download firmware updates for your server.Important: Some cluster solutions require specific code levels or coordinated code updates. If thecomponent is part of a cluster solution, verify the latest Best Recipe code level menu for cluster supportedfirmware and driver before you update the code.• If you replace a part, such as an adapter, that contains firmware, you might also need to update thefirmware for that part. For more information about updating firmware, see “Update the firmware” on page189.• It is good practice to make sure that the server is working correctly before you install an optionalcomponent.• Keep the working area clean, and place removed components on a flat and smooth surface that does notshake or tilt.• Do not attempt to lift an object that might be too heavy for you. If you have to lift a heavy object, read thefollowing precautions carefully:– Make sure that you can stand steadily without slipping.© Copyright Lenovo 2022 39