Completing the Installation 193. Leave enough slack in the cables to allow them to flex when thedrawer is pulled out.4. Check the cables for tight spots while the drawer is being pulledforward and pushed back into place. Check for stress points especiallyat the bends in the cable retractor and where the cable retractor ismounted to the vertical mounting rail.5. Route the cables to their destinations and secure with tie straps asrequired.6. If necessary, bundle and secure excess cable with a tie strap to keep itout of the way.Securing the System1. Close the rear door of the system. Lock if desired.2. Push the system drawer back until its front panel presses against thevertical mounting rails in the cabinet. Secure the drawer with fourscrews.3. Close the front door. Lock if desired.