3-66 G60 GENERATOR PROTECTION SYSTEM – INSTRUCTION MANUALCONNECT TO THE G60 CHAPTER 3: INSTALLATION3Figure 3-68: EnerVista window2. If the status indicator is red, verify that the Ethernet network cable is properly connected to the Ethernet port on theback of the relay and that the relay has been properly set up for communications (steps A and B earlier).3. If a relay icon appears in place of the status indicator, then a report (such as an oscillography or event record) is open.Close the report to re-display the green status indicator.4. The Display Properties settings can now be edited, printed, or changed.3.9.1.1 Quick action hot linksThe EnerVista UR Setup software has several quick action buttons to provide instant access to several functions that areperformed often when using URs. From the online window, users can select the relay to interrogate from a pull-downwindow, then click the button for the action to perform. The following quick action functions are available:• View the event record• View the last recorded oscillography record• View the status of all G60 inputs and outputs• View all of the G60 metering values• View the G60 protection summary• Generate a service report3.9.2 Use Quick Connect via the front panel RS232 portThis feature applies to the enhanced and standard front panels.To connect to the UR from a computer using a serial cable:1. Connect a nine-pin to nine-pin RS232 serial cable to the computer and the front panel RS232 port.2. Verify that the latest version of the EnerVista UR Setup software is installed (available from the GE EnerVista DVD oronline from http://www.gegridsolutions.com/multilin). See the software installation section if not already installed.3. Start the EnerVista UR Setup software, or in EnerVista Launchpad select the UR device to start the software.