3.4.13 Inspection of air hoses (Foundry Prime)GeneralThe air hoses on Foundry Prime robots must be inspected for leakage every sixmonths.Required equipmentArt. no.Equipment, etc.-Leak detection spray-Pressure gauge-Cut off valveProcedureFor this test it is recommended that the air supply to the robot has a pressuregauge and a cut-off valve connected.NoteActionRecommended pressure:Apply compressed air to the air connector onrobot base, and raise the pressure with theknob until the correct value is shown on thepressure gauge.10.2-0.3 barD C B Axx1500002399• A: Air connection robot• B: Pressure gauge• C: Cut off valve• D: Air connectionIt should take at least 5 seconds for thepressure to reach 0 bar.Close the cut off valve.2The time is < 5 seconds:• If the answer is YES: Localize theleakage by following the proceduresbelow.• If the answer is NO: The system is OK.Remove the leak testing equipment.3Pressurize by opening the cut off valve.4Continues on next page148 Product manual - IRB 4600 Foundry Prime3HAC040585-001 Revision: M© Copyright 2013-2018 ABB. All rights reserved.3 Maintenance3.4.13 Inspection of air hoses (Foundry Prime)