3 Maintenance3.1 IntroductionStructure of this chapterThis chapter describes all the maintenance activities recommended for the IRB4600 Foundry Prime.It is based on the maintenance schedule found at the beginning of the chapter.The schedule contains information about required maintenance activities includingintervals, and refers to procedures for the activities.Each procedure contains all the information required to perform the activity,including required tools and materials.The procedures are gathered in different sections and divided according to themaintenance activity.Safety informationObserve all safety information before conducting any service work.There are general safety aspects that must be read through, as well as more specificsafety information that describes the danger and safety risks when performing theprocedures. Read the chapter Safety on page 17 before performing any servicework.NoteIf the IRB 4600 Foundry Prime is connected to power, always make sure that theIRB 4600 Foundry Prime is connected to protective earth before starting anymaintenance work.For more information see:• Product manual - IRC5Product manual - IRB 4600 Foundry Prime 1073HAC040585-001 Revision: M© Copyright 2013-2018 ABB. All rights reserved.3 Maintenance3.1 Introduction