OneStart

Keysight Technologies 34970A manuals

34970A first page preview

34970A

Brand: Keysight Technologies | Category: Switch
Table of contents
  1. copyright notice
  2. Software Updates/Licenses
  3. Safety Symbols
  4. Safety Considerations
  5. Do Not Remove the Instrument Cover
  6. Environmental Conditions
  7. Regulatory Markings
  8. Waste Electrical and Electronic Equipment (WEEE) Directive
  9. The Front Panel at a Glance
  10. The Front-Panel Menu at a Glance
  11. Display Annunciators
  12. The 34970A Rear Panel at a Glance
  13. The 34972A Rear Panel at a Glance
  14. The Plug-In Modules at a Glance
  15. a multifunction module
  16. In This Book
  17. Table Of Contents
  18. Table Of Contents
  19. Table Of Contents
  20. Table Of Contents
  21. Table Of Contents
  22. 1 Specifications
  23. Quick Start Quick Start
  24. To Prepare the Instrument for Use
  25. To Connect Wiring to a Module
  26. To Set the Time and Date
  27. To Configure a Measurement Channel
  28. To Monitor a Single Channel
  29. To Close a Channel
  30. quick start
  31. If the Instrument Does Not Turn On
  32. To Adjust the Carrying Handle
  33. To Rack Mount the Instrument
  34. Front-Panel Overview Front-Panel Overview
  35. Front-Panel Menu Reference
  36. To Unsecure for Calibration
  37. To Secure Against Calibration
  38. To Change the Security Code
  39. Error Messages
  40. To Perform a Zero Adjustment
  41. To Apply Mx+B Scaling to Measurements
  42. To Read the Relay Cycle Count
  43. To Read a Digital Input Port
  44. To Write to a Digital Output Port
  45. To Read the Totalizer Count
  46. To Output a DC Voltage
  47. Calibration Procedures Calibration Procedures
  48. Keysight Technologies Calibration Services
  49. Time Required for Calibration
  50. Recommended Test Equipment
  51. Input Connections
  52. Calibration Security
  53. To Unsecure the Instrument Without the Security Code
  54. Calibration Message
  55. Calibration Procedure
  56. Test Considerations
  57. Performance Verification Tests
  58. Self-Test
  59. Quick Performance Check
  60. Internal DMM Verification Tests
  61. Gain Verification
  62. Optional AC Performance Verification Tests
  63. Internal DMM Adjustments
  64. Gain Adjustment
  65. VDC Adjustment Procedure (Optional)
  66. Plug-in Module Test Considerations
  67. Relay Verification
  68. Optional) 34901A Relay Contact Resistance Verification
  69. Optional) 34902A Relay Contact Resistance Verification
  70. Optional) 34903A Relay Contact Resistance Verification
  71. Optional) 34904A Relay Contact Resistance Verification
  72. Optional) 34905/06A Relay Contact Resistance Verification
  73. Optional) 34908A Relay Contact Resistance Verification
  74. Thermocouple Reference Junction (Optional)
  75. Thermocouple Reference Junction Adjustments
  76. A Analog Output
  77. Analog Output Adjustment
  78. 5 Theory of Operation
  79. Theory of Operation
  80. System Block Diagram
  81. Floating Logic
  82. Memory
  83. Earth-Referenced Logic
  84. Power Supplies
  85. Front Panel
  86. Backplane
  87. Internal DMM
  88. Input
  89. Input Amplifier
  90. Ohms Current Source
  91. AC Circuit
  92. A-to-D Converter
  93. Switch Modules
  94. Switch Module Control
  95. Relay Drivers
  96. A/34906A
  97. Multifunction Module
  98. Totalizer
  99. Analog Output
  100. Digital I/O
  101. Service Service
  102. Operating Checklist
  103. Types of Service Available
  104. Repackaging for Shipment
  105. Electrostatic Discharge (ESD) Precautions
  106. To Replace the Power-Line Fuse
  107. Self-Test Procedures
  108. Disassembly
  109. General Disassembly
  110. Internal DMM Disassembly
  111. Front Panel Disassembly
  112. Additional Chassis Disassembly
  113. Plug-In Module Disassembly
  114. Recyclable Parts
  115. Replaceable Parts