Groundsmaster 4100--D/4110--D Cutting DeckPage 8 -- 13Cutting Deck Link ServiceDisassembly (Fig. 10)1. Press bushings from top of link.2. Remove dust cap and retaining ring from link.3. Press tapered stud with spherical bearing, flat wash-ers and flange nut from link.4. Remove flange nut and press spherical bearing fromtapered stud.Assembly (Fig. 10)1. Install new spherical bearing onto tapered stud. Se-cure bearing with flange nut. Torque nut from 30 to 40ft--lb (41 to 54 N--m).2. Position flat washer in both sides of spherical bear-ing.3. Press tapered stud with spherical bearing, flat wash-ers and flange nut into link. Secure spherical bearinginto link with retaining ring.4. Press bushings into top bore of link.5. If cap screw and jam nut were removed from rearlink, install cap screw to allow 1.625” (41.3 mm) betweenthe head of the screw and the side of the link (Fig. 11).6. After link is installed on deck, check distance be-tween center deck blade and wing deck blade. Readjustcap screw and jam nut on rear link if needed (see WingDeck Service in this Chapter).1. Link2. Bushing (2 used)3. Tapered stud4. Spherical bearing5. Flat washer (2 used)6. Retaining ring7. Flange nut8. Dust capFigure 1030 to 40 ft--lb(41 to 54 N--m)13 6 74 5281. Rear link2. Cap screw3. Hex jam nutFigure 111.625”(41.3 mm)123CuttingDeck