Sealey SSCL4 Instructions Manual
Also see for SSCL4: ManualQuick start guideManual
INSTRUCTIONS FOR:PLATFORM SCAFFOLD TOWEREXTENSION PACK 4Model No. SSCL4Thank you for purchasing a Sealey product. Manufactured to a high standard this product will, if used according to these instructionsand properly maintained, give you years of trouble free performance.IMPORTANT: PLEASE READ THESE INSTRUCTIONS CAREFULLY. NOTE THE SAFE OPERATIONAL REQUIREMENTS, WARNINGS & CAUTIONS. USETHE PRODUCT CORRECTLY AND WITH CARE FOR THE PURPOSE FOR WHICH IT IS INTENDED. FAILURE TO DO SO MAY CAUSE DAMAGE AND/ORPERSONAL INJURY AND WILL INVALIDATE THE WARRANTY. PLEASE KEEP INSTRUCTIONS SAFE FOR FUTURE USE.1. SAFETY INSTRUCTIONS WARNING! Take care when using and moving scaffolding,extended ladders and other such equipment in the vicinityof power cables - risk of potentially fatal electric shock. WARNING! Ensure Health and Safety, local authority, andgeneral workshop practice regulations are adhered to whenusing this equipment.3 Familiarise yourself with the application and limitations of thescaffold, as well as the potential hazards.3 Maintain the equipment in good condition.7 DO NOT use the equipment if any parts are damaged or missingas this may cause failure and/or personal injury.3 Replace or repair damaged parts. Use genuine parts only.Non-authorised parts may be dangerous and will invalidate thewarranty.3 Keep the work area clean, uncluttered and ensure there isadequate lighting. WARNING! Use scaffold on level and solid ground and ensurethe brakes are applied and/or that the scaffold is anchored andheld firmly in place by some means. WARNING! DO NOT erect or use the scaffolding on sloping orunstable ground. WARNING! Never over-reach when on the scaffolding.3 Keep children and unauthorised persons away from the workingarea.7 DO NOT use the scaffolding for any purpose other than that forwhich it is designed.7 DO NOT allow children to climb the scaffolding.7 DO NOT use the equipment when you are tired, under theinfluence of alcohol, drugs or intoxicating medication.3 When not in use store in a safe, dry, childproof area.7 DO NOT use the equipment without side guardrails, knee railsand toeboards fitted. Use all the components supplied.3 When used outside, mobile scaffold towers should, whereverpossible, be secured to a building or other reliable structure.3 It is good practice to tie in all scaffold towers of any height,especially when left unattended or in exposed windy conditions.Use only the recommended wall anchors.3 Beware of strong wind conditions. Do not erect or use afreestanding tower if the wind is likely to exceed 7.7 m/sec(17mph or Beaufort force 4).3 Take care when using mobile scaffold towers in hangers oruncovered buildings as windforce may be increased due tofunnelling effects.7 DO NOT climb a tower from the outside. Never climb on thehorizontal or diagonal braces. You should only climb the tower onthe inside using the ladder end frames.7 DO NOT lean ladders against the tower. Never use ladders orboxes to gain additional height.3 Ensure that all personnel, tools and materials are removed fromthe tower prior to moving it. Only move the scaffold towermanually on a firm level surface, which is free of any obstacles.Only move it longitudinally or diagonally. Do not exceed normalwalking speed. Raise the stabilisers 12 mm (½”) from the ground.After moving re-lock the castors, check that the tower is leveland ensure that the stabilisers are secure and have a firm footing.7 DO NOT exceed the safe working load of the platform. Themaximum capacity of the working platform for an evenlydistributed load is 1.5 kN/m² (according to HD1004 – scaffoldtower Class 2)7 DO NOT jump on to or off the platforms.7 DO NOT use any lifting equipment on the mobile scaffold tower.2. INTRODUCTIONExtension Kit to be used with SSCL1 & SSCL3. Further increases theplatform height to 5.15mtr and the working height to 7.0mtr.Manufactured from robust aluminium with anodized finish for durablecorrosion resistance.3. SPECIFICATIONModel No: ......................................................................................SSCL4Width: ......................................................................................... 1780mmWidth with support legs: ............................................................. 3810mmDepth ............................................................................................ 860mmMaximum Working Height: ............................................................7.0mtr*Maximum Platform Height: ..........................................................5.15mtr*Maximum capacity...........................................................................200kgWeight: ..............................................................................................10kg*Only when used with SSCL1 & SSCL37 DO NOT bridge between the mobile scaffold tower and buildings.3 Stabilisers and ballast weights shall always be fitted wherespecified. Ballast is used at the base to stabilise towers fromoverturning. Ballast must be of solid material (i.e. NOT water orloose sand) and should be positioned so as not to overloadindividual legs. Ballast should be secured from accidental removal.3 Keep equipment clean and inspect before and after use fordamage. Use serviceable equipment only. All working parts e.g.castors, adjustable legs; stabiliser clamps should be lubricatedlightly with oil. Repairs should only be carried out by the supplieror other competent person approved by the supplier.4. CONTENTSReference Description QuantityB Diagonal Brace 3F 6 Rung End Frame 2Original Language VersionSSCL4 Issue No.1 - 08/06/10 |
Related manuals for Sealey SSCL4
This manual is suitable for:
Product
Menu
Learn More
Menu
Legal
Menu
Copyright © 2024 OneStart. All Rights Reserved