Ver.Smart MBS RRH-P4 Installation Manual/Ver.3.0© SAMSUNG Electronics Co., Ltd. 2-472600-00CTEIGAA 4.02) Install one power cable (hybrid cable, AWG10, 2C) connected to the baseband rack’sDC SPD terminal to the RRH-P4 power terminal. (Refer to the ‘Caution for installingthe power cable’).3) Cut cable installed to the power terminal. Unsheathe outer cable sheath at 1.38 in.(35 mm) length and peel off the inner wire at 0.39 in. (10 mm) length.4) Insert a heat shrink tube (0.59 in./15 mm) for each inner wire and compress the wirewith pressure terminal (AWG10). pressure terminal: AWG10, ring type, hole diameter: 0.2 in. (5.3 mm)5) Align the heat shrink tube (-48 V: blue, RTN: red) at the compressed part of thepressure terminal and shrink the tube using the heating gun.6) Fix heat shrink tube (jelly type, 12/4, 1.97 in. (50 mm)] at stripped external sheath andshrink the heat shrink tube using a heat gun. At this time, match the end of unsheathedexternal cable and the end of heat shrink tube.