Section 16202 To Do ListChecking OFF To Do List ItemsWhen items are completed, they can be checked off to indicatethe item has been completed.Checking off a Completed Item1. Tap the check box located on the left side of the “To DoList” item.Note:The To Do List can be setto display or hide itemsthat have already beenchecked off. By default,completed items will notbe displayed but arealways stored until youdelete them.Changing Priorities and Due DatesYou can change the To Do List to display the due date assignedto an item, change its priority, and assign a category to thetask with the To Do Item Details dialog box.You can then sort To Do List items by priority, due date, orcategory.Changing the Priority, Due Date and Category1. In the To Do List, tap the desired item.2. Tap the “Details” button.3. In the Details dialog box, tap the “Category” drop downmenu. Select the desired category, or create a new one.4. In the Details dialog box, tap the “Due Date” drop downmenu. Choose one of the following options: Today - Automatically inserts the date in the “Due Date”field.