Installation Instructions Section 22-4 Part No. 80-1214-3Leveling the Ice Storage Bin1. Screw the leveling legs onto the bottom of the bin.2. Screw the foot of each leg in as far as possible.3. Move the bin into its final position.4. Level the bin to assure that the bin door closes andseals properly. Use a level on top of the bin. Turneach foot as necessary to level the bin.NOTE: An optional caster assembly is available for usein place of the legs. Installation instructions are suppliedwith the casters.Leveling Leg and FootCondenser Air Baffle(QC700/QF800 Air-Cooled Ice Machines Only)The air-cooled baffle prevents condenser air fromrecirculating. To install:1. Remove the back panel screws next to thecondenser.2. Align the mounting holes in the air baffle with thescrew holes and reinstall the screws.Air Baffle! CautionThe legs must be screwed in tightly to prevent themfrom bending.SV1606THREAD LEVELINGLEG INTO BASE OFCABINETTHREAD ‘FOOT’ IN ASFAR AS POSSIBLESV1607AIRBAFFLESCREWSRevised 8/2003Downloaded from www.Manualslib.com manuals search engine