C. Basic Sequence of Operations1. Basic Sequence of Operations at Power-On (1/2)When the surface temperature of the fixing roller is 75°C or less and, in addition, theambient temperature is 17°C or more at power-on,Figure 2-103Primary, transfer,separation, pre-transfercharging wire cleaning motorINTRPower switchONFixing sub heater(H2)Main motor (M1)Primary chargingassemblyDeveloping bias DCDeveloping bias ACPre-transfer chargingassembly DCPre-transfer chargingassembly ACTransfer chargingassemblySeparation chargingassembly DCSeparation chargingassembly ACPre-exposure LEDBlanking exposureLED