CPU Software Version NumbersEN | 85Appendix B Installation ChecklistsA simplified guide for those who are already familiar with installing and program-ming Allegiant systems.MAIN BAY HARDWARE INSTALLATION✔ Unpack equipment and verify that items have been received without carrier damage.✔ Install power supply (do not turn ON) and CPU module.✔ If applicable, install bay into EIA 19-inch rack (remember to remove rubber bumperfoot pads.✔ Install video input module(s) following proper termination procedures. Install videooutput module(s).✔ Connect camera inputs and monitor outputs to appropriate connections on equip-ment bay(s).✔ Connect system keyboards, any alarm interface unit(s), and any signal distributionunit to the main bay.✔ Set CPU DIP switches to activate desired features.✔ Apply main AC power to equipment.✔ Verify system is operating properly then begin appropriate programming.PROGRAMMING VIA SYSTEM KEYBOARD✔ Enter system time (User Function 7) and date (User Function 8). Enter Camera IDtitles (User Function 9), and if desired, adjust monitor overlay displays (User Function4, 5, & 6 or 24, 25 & 26).✔ Enter desired Sequences.✔ Configure and test alarm response mode.SATELLITE CONFIGURATION HARDWARE INSTALLATIONMain Site:✔ Install main Allegiant bay and appropriate accessory products accordingly. Verifythe biphase control code line is run to each satellite site.✔ Attach trunk line inputs, local camera inputs, and monitor outputs to the main Alle-giant bay. Apply main AC power to equipment.✔ Program Camera ID Table using the LTC 8059 MCS package.✔ Switch all unused monitor outputs located at the main site to display a 'local' cam-era input.Satellite Site(s):✔ Install satellite switcher and appropriate accessory products accordingly.✔ Connect the biphase code line to the LTC 8780 Data Converter unit and configureaccording to the desired satellite address and switcher's baud rate.✔ If necessary, program the satellite switcher for the desired camera titles and anyother related requirements.