EN | 16 Bosch Security Systems | December 13, 20057 Installation Procedure7.1 Main CPU Bay InstallationBefore discarding the shipping cartons, verify that the various pieces of equipmenthave no evidence of carrier damage.CAUTION Do not apply power to the equipment until instructed to do so.1. Remove the front panel of the main CPU bay by loosening the four (4) cornerfasteners.2. Install the power supply in far right position of the main CPU bay insuringproper alignment and seating of the module into the rear mating connector. Ver-ify that the power supply ON/OFF switch is in the OFF position.3. Install the four (4) screws and star washers (supplied) on the rear panel of thebay(s) surrounding the power supply line cord to fasten the power supplysecurely in place.CAUTION If the Allegiant card cage is to be transported, the main power supply should beremoved to prevent possible damage to the bay's internal parts.4. If the bay(s) are to be installed into a standard 19-inch EIA rack, remove thefour (4) rubber bumper foot pads found on the bottom of the bay before install-ing the unit in the rack. Four (4) holes are provided for mounting the bay(s) inthe rack.7.2 Video Input ModulesTermination switches on the Video Input Modules (VIM) must be set to the correctposition prior to installation. If necessary, see Section 7.6 “Termination Practices,” onpage 18 prior to actually installing the VIM on this system.The appropriate number of VIMs should be installed in the main bay starting withthe left most slot. If less than full capacity is being used, the modules should beinserted in a left-to-right manner so that the lower camera numbers are used first.Figure 3: Typical Video Input Module InsertionThe VIMs are identical and are interchangeable within the designated VIM slotswithout having to make any changes to the module.