– 30 –Using the Service monitor with the [ MONITOR] button during the test modePush the [ MONITOR] button1 Push the [ ∧ ] / [ ∨ ] button toselect “4. Monitor function” on the “Fieldsetting menu” screen, then push the“ Set” [ F2] button.Push the [ ∧ ] / [ ∨ ] button to selectthe code to check data.2 Refer to the Installation Manual suppliedwith the indoor unit or outdoor unit orservice manual for details about the checkcode and data.3 Push the [ CANCEL] button to return tothe “Field setting menu” screen.TestRoom A 12:00Mode Fan SpeedHeatCode00Data0024ReturnMonitor functionMonitor functionCode00Data0024ReturnSet Items to check before conducting a trial operationCheck the following items before the trial operation. The numbers in (parentheses) are the chapter numbers in thetable of contents of the installation manual.*1 Do not operate the air conditioner (run the compressor) before the address to the hot water module is fixed.Doing so will cause the heat exchanger in the hot water module to freeze, rupture, and leak water.*2 Set DIP switch 4 of SW09 on the P.C. board of the header outdoor unit to "ON" (factory default is "OFF").The VRF system will be stopped to avoid water freezing when the power supply is disconnected.NOTEBefore you run the compressor, always confirm that the hot water module is operable (power on, address fixed,communication wiring complete).Failure to do this will cause the heat exchanger in the hot water module to freeze, rupture, and leak water.CheckInstallation workIs the equipment attached to the legs with bolts? (See chapter 5.)Is there sufficient open space around the equipment for servicing? (Seechapter 5.)Have the criteria for selecting a location to install the equipment been met?(See chapter 4.)Piping workAre all of the pipes connected correctly? (See chapter 5.)Are there no water leaks?Is the flow rate suitable? (See chapter 6.)Is the strainer in a suitable location? (See chapters 3 and 6.)Is the line heater in a suitable location and is the flow rate suitable? (Seechapters 3 and 6.)Have suitable safety devices for pressure relief and expansion tanks beeninstalled? (See chapters 3 and 6.)Is the shut-off valve in a suitable location? (See chapters 3 and 6.)Is the air vent valve in a suitable location? (See chapters 3 and 6.)Is the piping material suitably heat resistant and corrosion resistant? (Seechapters 6 to 8.)Can water discharge through the drain? (See chapter 7.)Was the heat-retention work done suitably? (See chapters 6 to 8.)Electric wiring workIs the electric wiring connected correctly? (See chapter 9.)Is the electric wiring thick enough? (See chapter 9.)Is the power fed from a dedicated ground fault circuit breaker?Is the output terminal wired? (See chapter 9.)Is the addressed fixed? (*1)Outdoor unit board settings Has DIP switch 4 of SW09 on the interface board of the header outdoorunit been set to "ON" (factory default is "OFF")? (See chapter 9.) (*2)59-EN 60-EN