Page 10 INSTALLATIONRECEIVING AND UNPACKINGThe circuit breaker units are subjected to factoryproduction testing prior to being packed andshipped.ACCEPTANCE INSPECTIONConfirm that the circuit breaker unit is complete,correct as specified and undamaged fromshipment and handling.Upon receipt of the equipment, do the following:1) Make an immediate inspection for damagethat might have occurred during shipment. Ifdamage is discovered, it should be notedwith the carrier prior to accepting theshipment, if possible.2) Carefully unpack the equipment sufficiently tocheck for missing parts or concealeddamage.3) Check for the presence of accessories thatare shipped with the circuit breaker:- Charging Handle (shipped loose withMU and ML type breakers) (Fig. 4)- Insulating cylinders (qty-6) (Fig. 5)3) Keep the circuit breaker upright.Never lay the circuitbreaker on its side orupside down. This maycause damage.4) File a claim with the carrier for any damagedor missing items and immediately notify thenearest Toshiba representative.Do not install or energizeequipment that has beendamaged. Damagedequipment can fail duringoperation, resulting in fireand explosion.Fig. 4 Charging HandleFig. 5 Insulating CylinderCAUTIONWARNINGPhone: 800.894.0412 - Fax: 888.723.4773 - Web: www.clrwtr.com - Email: info@clrwtr.com