2-14 IXS-6600/67002-4-4. Downloading the DataDownloads the various setup data that are saved in a PC, to the system equipment through primarystation.1. Install the BZR-20 software. (Refer to Section 2-4-2.)2. Connect the PC to the IXS-6700/IXS-6600 (or connect the PC to each equipment) and start up theBZR-20 software. (Refer to Section 2-4-3, steps 2 to 5.)3. Select a desired folder (the folder in the hard disk or FD drive) in which the setup data are saved,from the File (F) menu of the menu bar. Press [OK ].nYou cannot create a new folder at this step.4. Select the desired button from “SEND: PC to PRIMARY” column that suits to the contents of thedownloaded data and press the button.DescriptionF5 : It downloads the names of the total 2048 connectors of the SOURCE (input) andDESTINATION (output) that are stored in the PC.CrosspointF6 : It downloads the latest cross-point status data (1024 sources and 1024 destinations,level: 8) that are saved in the PC.PrimaryF7 : It returns the setup data of the primary station to the original state. (The data as thesecondary station that are stored in the primary station are also returned to theoriginal state.)nThe name of the connector and the cross-point data are not downloaded.SecondaryF8 : It downloads the setup data of the secondary equipment that is connected to the S-BUS remote. Either all of the setup data that are stored in the specified folder, or anysingle specified secondary station can be selected for downloading.Press Cancel (C) to stop downloading.5. When downloading is completed, press Exit (E) and close the BZR-20 window.nIn the case that the BZR-20 is connected to the S-BUS subnet controller*, the primary station indicates theS-BUS subnet controller and the secondary station indicates the third-level station connected to the S-BUS subnet controller in the above description.* BZR-IF810 is the software supplied with the HKSP-R80. For details, refer to the HKSP-R80 Installation Manual.