EB SERIES EN-32. INSTALLATION2.1 UnpackingUnpack and verfy that the followng components have been ncluded:• Scale Unt• Weghng Platform (plastc base wth stanless steel pan)• Instructon Manual• AC AdapterSave the packagng materal. Ths packagng ensures the deal protecton for thestorage or transport of the product.2.2 Installing ComponentsPoston the weghng platform pns nto the through-holes on the top housng, thenset the platform securely nto place. Secure the n-use cover wth double-sded tapeas needed.IMPORTANT:• Before usng the scale, remove the shipping protection screw locatedunderneath the scale. Ths screw ensures protecton of the load cell durngtransport, but wll need to be removed for the scale to operate properly.• It s recommended that the protectve screw be re-nstalled f transportng thescale. Do not over-tghten the protectve screw as t may damage the loadcell. To re-nstall, turn the scale on and place a 500g weght on the pan,then slowly screw n the protecton screw untl the dsplay shows a valuebetween 250g to 400g.2.3 Selecting the LocationOperate the scale on a frm, level surface. Avod locatons wth rapd temperaturechanges, excessve ar currents, vbratons, electromagnetc felds, heat or drectsunlght.2.4 Leveling the ScaleAdjust the levelng feet untl the bubble s centered n the crcle of the level ndcator(located on the front panel).NOTE: Ensure that the scale s level each tme ts locaton s changed.