ABB XFC G5 manuals
XFC G5
Brand: ABB | Category: Controller
XFC G5
Brand: ABB | Category: Remote Control
Table of contents
- Table Of Contents
- Table Of Contents
- Cyber security
- Additional information
- Safety
- Potential safety hazards
- Compliance
- Considerations before installation
- Site planning and requirements
- Wiring requirements
- Basic hardware installation
- Unpack and inspect
- Pipe mount installation
- Wall-mount installation
- Direct-mount installation
- Ground equipment
- Install and connect the RTD for the XFC
- Install antenna (for wireless functionality)
- Install battery and charger
- Install the solar panel
- Wire COMM ports
- XRC COMM pinouts
- Wire I/O
- Digital input and output (DI/DO) pinouts
- Powering the device
- Power with battery and charger
- Connect the charger
- Power with external power supply
- Enable real time clock backup
- Local communication with the device
- Establish connection with the XFC or XRC
- Change to Expert view
- Configure the basic parameters
- Change the default time and date format
- Initial measurement application setup
- Configure communications
- Configure COMM2
- Configure for network communication
- Enable and configure Ethernet
- Enable Wi-Fi
- Enable Bluetooth
- Configure basic security (recommended)
- Commission the device
- Optional volume reset (recommended)
- Troubleshooting
- Failure to start
- Remote communication failure
- Contact us
XFC G5
Brand: ABB | Category: Measuring Instruments
Table of contents
- Table Of Contents
- Table Of Contents
- Table Of Contents
- Table Of Contents
- Table Of Contents
- Table Of Contents
- Table Of Contents
- Table Of Contents
- Additional information
- Safety
- System Description
- Operating system
- Table 1-2: XFC G5 applications
- Log period data records
- Display application
- Configuration files
- Customer data collection files
- Enclosures
- Electronic board
- Table 1-6: Local communication ports/wireless support (local operator access)
- Table 1-8: Network connection (Ethernet)
- Battery and charger power configurations
- Site planning and requirements
- Install PCCU
- Installation
- Direct-mount installation
- Overview
- Termination panel
- Figure 3-4: 6990 Rack mount enclosure
- Install the RTD
- Figure 3-6: Typical RTD installation
- Install battery and charger
- Figure 4-1: Solar panel
- Wire COMM ports
- Figure 5-1: XFC G5 R-232 COMM1
- Figure 5-2: XFC G5 R-232 COMM2
- Figure 5-3: XFC G5 R-485 COMM1
- Figure 5-5: XRC RS-232 COMM 1
- Figure 5-6: XRC RS-485 COMM 1
- Wire I/O
- Analog inputs (AI)
- Digital outputs (DO)
- Figure 6-2: XRC AI terminals and input mode selector jumpers
- Figure 6-4: XRC DI/PI/DO terminals, input mode switches, and debounce jumpers
- Powering the Device
- Connect the battery (dc power)
- Figure 7-4: XFC G5 charger connection
- Figure 7-6: Battery and switch
- Basic configuration and startup
- Figure 8-1: System Setup
- Figure 8-3: PCCU32 Date/Time synchronization warning
- Station setup
- Figure 8-7: Station Setup detail
- Figure 8-8: Flow Measurement Advanced Setup (Gas orifice)
- Configure COM1
- Figure 8-11: XFC G5 COMM terminals (Module in COMM1 slot shown)
- Figure 8-13: Verify the communications set up for COMM1
- Configure COM2
- Configure for network communication
- Enable Wi-Fi
- Figure 8-17: Wi-Fi tab screen
- Enable Bluetooth
- Figure 8-19: Enable Bluetooth
- Figure 8-21: Add/Assign Bluetooth application to Bluetooth interface
- Validate the device measurement
- Optional volume reset (recommended)
- Configure security (recommended)
- Open Transmission Control Protocol (TCP) ports
- Denial of service (DOS) thresholds rates
- Figure 9-2: S1 Security switch
- Default access roles
- Figure 9-4: Security Editor screen
- Edit the security file
- Enable RBAC authentication on communication ports
- Use default RBAC credentials
- Figure 9-9: Login dialog box
- Supported SSH/SFTP accounts
- Update default SSH/SFTP keys
- Figure 9-11: Puttygen Key Generator
- Figure 9-13: New public key
- Figure 9-14: New private key and passphrase
- Figure 9-16: Select location to save private key file
- Figure 9-18: Copy generated public key
- Figure 9-19: Enable the SSH/SFTP service
- Figure 9-21: FileZilla Site Manager connection setup
- Figure 9-22: Type private key passphrase (password)
- Figure 9-24: Open the /Flash/AppData/.ssh/ directory
- Figure 9-27: Restart Totalflow device after public key update
- Service and maintenance
- Save the device configuration
- Figure 10-2: Station Setup and Backup
- Figure 10-3: 32Bit Loader confirmation pop-up
- Figure 10-5: Save Software from Device window
- Figure 10-7: Select location to save config file
- Backward or forward clock change not crossing an hour boundary
- Warm restart with onboard RESET button
- Warm restart from the device loader
- Warm restart from PCCU entry mode
- Warm restart using terminal mode
- Cold restart from the device loader
- Cold restart from terminal mode
- Restart using the factory configuration
- Remove power from the electronic board
- Reconnect power to the electronic board
- Replace the 12 Vdc battery
- Replace the lithium battery
- Replace the LCD assembly
- Figure 10-24: XFC G5 Display connector
- Replace or add communication modules (COMM modules)
- Calibration
- Differential pressure checks
- Figure 11-2: DP calibration pressure checks
- Calibrating static pressure
- Calibrating differential pressure (DP)
- Zero transducer
- Static pressure
- Table 11-2: RTD wiring pinouts
- Table 11-3: AI calibration points
- Analog input calibration
- Analog input calibration (voltage mode)
- Figure 11-6: AI voltage default calibration values
- Analog input calibration (current mode)
- Figure 11-9: AI current default calibration values
- Verify analog input calibration
- Repeat calibration in case of errors
- Troubleshooting
- Table 12-2: Typographical of conventions
- Contact us