OneStart

Canon Paper Folding Unit-J1 manuals

Paper Folding Unit-J1 first page preview

Paper Folding Unit-J1

Brand: Canon | Category: Printer Accessories
Table of contents
  1. Table Of Contents
  2. Table Of Contents
  3. Table Of Contents
  4. Safety Precautions
  5. Points to Note About Turning Off the Main Power Switch
  6. Product Overview
  7. Outline
  8. Specifications
  9. Names of Parts
  10. Cross Section View
  11. Technical Explanation
  12. Basic Configuration
  13. Component Configuration
  14. Drive Configuration
  15. Controls
  16. Detecting Jams
  17. Power Supply
  18. Upgrading
  19. Periodical Service
  20. List of Work for Scheduled Servicing
  21. Disassembly/Assembly
  22. List of Parts
  23. Consumable Parts Requiring Periodic Replacement and Cleaning Points
  24. List of Motors / PCBs / Others
  25. List of Sensors
  26. External / Internal Covers
  27. Open the Feed Guide
  28. Removing the Front Lower Cover
  29. Removing the Front Inner Cover
  30. Removing the Right Inner Cover
  31. Main Units
  32. Removing the Through/Fold Branch Solenoid(SOL2)
  33. Removing the Fold/Separation Solenoid (SOL3)
  34. Removing the Folding Tray Flapper Solenoid (SOL4)
  35. Removing the C-fold Stopper Solenoid (SOL5)
  36. Removing the Through-pass Outlet Antistatic Needle
  37. Motors
  38. Removing the C-fold Stopper Motor (M9)
  39. Removing the Inlet Motor 2 (M12)
  40. Removing the Outlet Motor 2 (M13)
  41. Removing the Outlet Motor 1 (M14)
  42. Removing the Folding Position Adjustment Motor (M15)
  43. PCBs
  44. Others
  45. Adjustment
  46. Overview
  47. Basic Adjustment
  48. Major Adjustment
  49. Z-fold/Two-fold paper skew adjustment (Delivery guide protective sheet protrusion adjustment)
  50. C-fold/Two-fold/Four-fold (1st fold) inclination adjustment (Trailing edge stopper inclination)
  51. Action on parts replacement
  52. Installation
  53. How to Check this Installation Procedure
  54. Checking before Installation
  55. Product Name
  56. Unpacking
  57. Checking the Contents
  58. Installation Outline Drawing
  59. Installation Procedure
  60. Connecting to Upstream Equipment
  61. Connecting the Interface Cable
  62. Connecting the Intermediate Power Cable
  63. Connecting the Shunt Cable
  64. Attaching the Label
  65. Making Checks after Completion of Installation
  66. Operation Checks
  67. APPENDICES
  68. Service Tools
  69. General Circuit Diagram
  70. General Circuit Diagram 2/5
  71. General Circuit Diagram 3/5
  72. General Circuit Diagram 4/5
  73. General Circuit Diagram 5/5