Cisco Catalyst 9600 Series manuals
Catalyst 9600 Series
Table of contents
- Table Of Contents
- Table Of Contents
- Table Of Contents
- product overview
- fan tray assembly
- high availability
- power supply module overview
- AC Power Supply Module
- DC Power Supply Module
- power supply modes
- preparing for installation
- site requirements
- air flow
- dust and particles
- emi and radio frequency interference
- shock and vibration
- system grounding
- maintaining safety with electricity
- preventing electrostatic discharge damage
- Rack-Mounting Guidelines
- site preparation checklist
- installing the switch
- Install the Switch as Shipped
- Rack-Mounting the Chassis as Shipped
- Install the Switch with Shelf Brackets
- Installing the Shelf Brackets and the Crossbar
- Installing the Cable Guide on the Chassis with Shelf Kit L-Bracket
- Rack-Mounting the Chassis
- Install the Switch in NEBS-Compliant Mode
- establishing system ground
- attaching an esd strap
- verifying the switch chassis installation
- installing the fan tray
- Information About Replacing a Fan Tray
- Removing the Fan Tray from the Front of the Chassis
- Removing the Fan Tray from the Rear of the Chassis
- installing a fan tray
- Installing the Fan Tray from the Front Panel of the Chassis
- Installing the Fan Tray from the Rear of the Chassis
- Verifying Fan Tray Installation
- required tools and equipment
- removing a power supply module
- installing a power supply module
- connecting to a power source
- connecting to a dc power source
- Verifying the Power Supply Installation
- finding the serial number
- technical specifications
- power supply specifications
- W DC-Input Power Supply Specifications
- chassis and module power and heat values
- Weight Specifications
- fan tray leds
- supervisor module leds
- line card leds
- Standard Accessory Kit Contents
- Shelf Kit Contents