PREMIER AD USER MANUAL, MAINTENANCE GUIDE & LOG BOOKApproved Document No: GLT.MAN-106A PAGE 14Issue: 2.00 Authorised: GH Date: 16/07/200710. FIRE ALARM LOG BOOKIt is recommended that this LOG BOOK section of the Manual be maintained by the responsible person(s) on site, whoshould ensure every event is properly recorded (including fire alarm conditions, failures, tests, temporary disconnections,disablements, enablements, dates of installing engineers’ visits together with a note of any outstanding work or panelconditions). This LOG BOOK must be available for inspection at all times.You can photocopy this log book to provide extra pages for when this book is full.BS5839 part 1 recommends that fire alarm events should be subdivided & recorded on separate sheets in the log book.The event categories are:Maintenance workFalse alarms – Where the sounders have activated with no signs of a fire.Any other events- This would be genuine alarms or faults.Company:Site Address:System designed by:System installed by:System commissioned by:System maintained by:Contract No:Responsible Person(s) on Site:Contract valid until:For Service (Other times) Tel:For Service (Normal hours Mon-Fri) Tel: