4.0 Getting Started4.1 Launching Test ApplicationsA Quick Guide is always presented in the Home screen after boot up.Note: This procedure can be started at any time, from any screen or menu1. Select an empty Test App buttonUp to two independent tests can run simultaneouslySome test applications use the two port groups (e.g. router wrap-around test)2. Select the Technology Group3. Select the desired Test Mode based on the application to be tested4. Tap on the OK button to confirmThe test port group is assigned to the selected test application.Required software/firmware is loaded.Go back to TOCMTTplus e_Manual D07-00-096P RevA00Page 11 of 66