2. Push buttons 2 and 3 to select the row whereyou want to place the pipe (Figure 6).g210062Figure 61. Pull pipe 2. Select pipe row3. Hold the lower section of the rocker switch(Figure 8) until the elevator lowers, the camassembly rotates toward the operator station,and the arms fully extend (Figure 9).g210518Figure 7g210462Figure 8g210517Figure 94. Release the rocker switch to proceed to the nextstep in the sequence (Figure 10).g210520Figure 105. Break the pipe connection; refer to RemovingDrill Pipes in the Operator’s Manual.3