105.5 Attach the extension posts to the back two uprights and assemble and mount the top shelf frame as shown in diagram 9.5.6 Attach the peg board and position the top shelf, work top and bottom shelf as indicated in diagram 10.5.7 Attach tool hooks to peg board as required. See diagram 10.9sealey Group, kempson Way, suffolk Business Park, Bury st edmunds, suffolk. iP32 7ar01284 757500 01284 703534 sales@sealey.co.uk www.sealey.co.ukenVironment ProtectionRecycle unwanted materials instead of disposing of them as waste. All tools, accessories and packaging should be sorted, taken toa recycling centre and disposed of in a manner which is compatible with the environment. When the product becomes completelyunserviceable and requires disposal, drain any fluids (if applicable) into approved containers and dispose of the product and fluidsaccording to local regulations.note: It is our policy to continually improve products and as such we reserve the right to alter data, specifications and component parts without priornotice.important: no liability is accepted for incorrect use of this product.Warranty: Guarantee is 12 months from purchase date, proof of which is required for any claim.AP12600.V4 Issue 2 06/02/19Original Language Version© Jack Sealey limited