12. DisassemblySeparate the four signal lines which connect the battery to the Tray BMS.Lay the main body down to ensure that the tray knob is visible. Work with at least twopersons (Overweight).Unfasten the screw on the battery tray to remove it from the main body.Lift the battery tray to separate it from the main body.Place the main body and the battery tray on the packing box. This process is the reverseorder of the installation process.12.2 PackagingMake sure to pack the 3.6 kWh All in One in the original box.If you have to pack in the box other than provided by Samsung SDI, consider the minimumweight of 95 kg.The main body must go into the box completely.12.3 StorageStore 3.6 kWh All One at a temperature ranging from -20 to 60℃.12.4 DisposalIf the battery or the product life has expired, the regulations for the disposal of electronicproducts in that region must be followed, and if it is not possible, send them to Samsung SDI.The address is indicated in the contact information (Chapter 13).Australia (Eng.) 05/2015. Rev1.1 93