OneStart

GE Giraffe Service Manual

Also see for Giraffe: Service manualOperation and maintenance manual

Page 1 preview
Page 2 preview
Page 3 preview
Page 4 preview
Page 5 preview
Page 6 preview
Page 7 preview
Page 8 preview
Page 9 preview
Page 10 preview
Page 11 preview
Page 12 preview
Page 13 preview
Page 14 preview
Page 15 preview
Page 16 preview
Page 17 preview
Page 18 preview
Page 19 preview
Page 20 preview
Page 21 preview
Page 22 preview
Page 23 preview
Page 24 preview
Page 25 preview
Page 26 preview
Page 27 preview
Page 28 preview
Page 29 preview
Page 30 preview
Page 31 preview
Page 32 preview
Page 33 preview
Page 34 preview
Page 35 preview
Page 36 preview
Page 37 preview
Page 38 preview
Page 39 preview
Page 40 preview
Page 41 preview
Page 42 preview
Page 43 preview
Page 44 preview
Page 45 preview
Page 46 preview
Page 47 preview
Page 48 preview
Page 49 preview
Page 50 preview
Page 51 preview
Page 52 preview
Page 53 preview
Page 54 preview
Page 55 preview
Page 56 preview
Page 57 preview
Page 58 preview
Page 59 preview
Page 60 preview
Page 61 preview
Page 62 preview
Page 63 preview
Page 64 preview
Page 65 preview
Page 66 preview
Page 67 preview
Page 68 preview
Page 69 preview
Page 70 preview
Page 71 preview
Page 72 preview
Page 73 preview
Page 74 preview
Page 75 preview
Page 76 preview
Page 77 preview
Page 78 preview
Page 79 preview
Page 80 preview
Page 81 preview
Page 82 preview
Page 83 preview
Page 84 preview
Page 85 preview
Page 86 preview
Page 87 preview
Page 88 preview
Page 89 preview
Page 90 preview
Page 91 preview
Page 92 preview
Page 93 preview
Page 94 preview
Page 95 preview
Page 96 preview
Page 97 preview
Page 98 preview
Page 99 preview
Page 100 preview
Page 101 preview
Page 102 preview
Page 103 preview
Page 104 preview
Page 105 preview
Page 106 preview
Page 107 preview
Page 108 preview
Page 109 preview
Page 110 preview
Page 111 preview
Page 112 preview
Page 113 preview
Page 114 preview
Page 115 preview
Page 116 preview
Page 117 preview
Page 118 preview
Page 119 preview
Page 120 preview
Page 121 preview
Page 122 preview
Page 123 preview
Page 124 preview
Page 125 preview
Page 126 preview
Page 127 preview
Page 128 preview
Page 129 preview
Page 130 preview
Page 131 preview
Page 132 preview
Page 133 preview
Page 134 preview
Page 135 preview
Page 136 preview
Page 137 preview
Page 138 preview
Page 139 preview
Page 140 preview
Page 141 preview
Page 142 preview
Page 143 preview
Page 144 preview
Page 145 preview
Page 146 preview
Page 147 preview
Page 148 preview
Page 149 preview
Page 150 preview
Page 151 preview
Page 152 preview
Page 153 preview
Page 154 preview
Page 155 preview
Page 156 preview
Page 157 preview
Page 158 preview
Page 159 preview
Page 160 preview
Page 161 preview
Page 162 preview
Page 163 preview
Page 164 preview
Page 165 preview
Page 166 preview
Page 167 preview
Page 168 preview
Page 169 preview
Page 170 preview
Page 171 preview
Page 172 preview
Page 173 preview
Page 174 preview
Page 175 preview
Page 176 preview
Page 177 preview
Page 178 preview
Page 179 preview
Page 180 preview
Page 181 preview
Page 182 preview
Page 183 preview
Page 184 preview
Page 185 preview
Page 186 preview
Page 187 preview
Page 188 preview
Page 189 preview
Page 190 preview
Page 191 preview
Page 192 preview
Page 193 preview
Page 194 preview
Page 195 preview
Page 196 preview
Page 197 preview
Page 198 preview
Page 199 preview
Page 200 preview
Page 201 preview
Page 202 preview
Page 203 preview
Page 204 preview
Page 205 preview
Page 206 preview
Contents
  1. Table Of Contents
  2. Table Of Contents
  3. Table Of Contents
  4. Table Of Contents
  5. Table Of Contents
  6. Table Of Contents
  7. Table Of Contents
  8. Table Of Contents
  9. Table Of Contents
  10. important safety information
  11. Chapter 1: Functional Description
  12. Figure 1-1 Block Diagram
  13. Relay Board
  14. Display Driver Board / EL Display
  15. LED Board
  16. DataLink Option
  17. Servo Controlled Oxygen Option
  18. Humidifier
  19. Chapter 2: Service Checkout
  20. Controller Checks
  21. Humidity Check
  22. Servo Controlled Oxygen Check
  23. Supply Valve Leak Test
  24. Scale Check
  25. Off Center Weight Check
  26. Cable Connections and Mechanical Controls
  27. Service Maintenance Schedule
  28. Figure 3-1 Control Board Test Points
  29. Special Tools
  30. Line Voltage Calibration
  31. Servo Controlled Oxygen Calibration
  32. Scale Calibration
  33. Leakage Current
  34. Startup Sequence
  35. Service Screen
  36. Figure 4-2 Second Service Screen
  37. Figure 4-4 Switch Diagnostic Diagram
  38. Figure 4-5 First Service Screen: Diagnostics
  39. Alarm Messages
  40. Baby Hot" or "Baby Cold" Alarm
  41. Bed Heater Failure" Alarm
  42. Bed Up/Down Pedal Switches Disabled" Alarm
  43. Humidifier Failure" Alarm
  44. Motor Drive Failure" Alarm
  45. Up Pedal Pressed" Alarm
  46. System Failure 1
  47. System Failure 5
  48. System Failure 11
  49. System Failure 15
  50. System Failure 16
  51. System Failure 19
  52. System Failure 23
  53. System Failure 26
  54. System Failure 30
  55. System Failure 35
  56. System Failure 55
  57. Additional Troubleshooting Tips
  58. Power Supplies
  59. Humidifier Heater/Safety Thermostat
  60. Incubator Heat Sink Sensor Thermistor
  61. Troubleshooting the Toroidal Transformer
  62. Servo Controlled Oxygen
  63. Servo Controlled Oxygen Alarm Messages
  64. Servo Controlled Oxygen Troubleshooting Tips
  65. Sensor Housing Temperature Sensor Temperature to Resistance Curve
  66. Chapter 5: Repair Procedures
  67. Hood Removal for Replacement
  68. Porthole Door Replacement
  69. Uprights and End Caps
  70. Re-installing the Upright
  71. Compartment Probe Repairs
  72. Lower Unit Repairs
  73. Incubator Fan/Motor/Optical Sensor
  74. Incubator Heater Replacement
  75. To Remove the Heater Closest to the Head of the Bed
  76. Elevating Base
  77. Figure 5-8 Elevating Base with Two-piece Shroud Assembly
  78. Figure 5-9 Elevating Base with Three-piece Shroud Assembly
  79. Chassis Replacement
  80. Humidifier Assembly Repairs
  81. Humidifier Disassembly
  82. Humidifier Reassembly
  83. Bed Tilt Brake Pad Replacement
  84. Caster Replacement
  85. Controller and Display Module Procedures
  86. Probe Panel
  87. Battery
  88. Controller Components
  89. Control Board
  90. Toroidal Transformer
  91. Servo Controlled Oxygen Service Procedures
  92. Replacing the Vent Screen
  93. Calibration Valve
  94. Valve Housing Repairs
  95. Supply Valves
  96. Exploded Views
  97. Probe Housing, Display Module, and Electrical Enclosure
  98. Figure 6-1 Probe Panel Assembly
  99. Figure 6-2 Display Module
  100. Figure 6-3 Electrical Enclosure
  101. Figure 6-4 Humidifier Transformer and RS232 Option
  102. Bed and Side Doors
  103. Figure 6-5 Bed
  104. Figure 6-6 Side Door (East/West)
  105. Figure 6-7 Flip Door, Corner Brackets, and Grommets
  106. Hood and Compartment Air Probe
  107. Figure 6-8 Compartment Air Probe
  108. Chassis
  109. Figure 6-9 Upper Chassis and Heat Sink
  110. Figure 6-10 Lower Chassis
  111. Figure 6-11 Humidifier Assembly
  112. Elevating Base, Old Designs
  113. Figure 6-12 Base and Elevating Column with Two-piece Shroud Assembly
  114. Elevating Base, Current Design
  115. Figure 6-13 Base and Elevating Column with Three-piece Shroud Assembly
  116. Hood Latch, Wire Covers, and Uprights
  117. Figure 6-14 Hood Latch and Wire Covers
  118. Figure 6-15 Uprights and End Caps
  119. Servo Control Oxygen
  120. Figure 6-16 Servo Control Oxygen Sensor Housing Assembly
  121. Figure 6-17 Servo Control Oxygen Valve Housing
  122. Figure 6-18 Expansion Chamber/Heatsink Vent
  123. Figure 6-19 Servo Control Oxygen Cooling Fan
  124. Figure 6-20 Servo Control Oxygen PC Board
  125. Accessory Hangers
  126. Storage Drawer
  127. Figure 6-23 Storage Drawer (on Units with Three-piece Shroud Assembly)
  128. Accessories
  129. Labels
  130. PCB Layouts
  131. Figure 6-34 Relay Board (6600-0214-850) Revision Level 10 or Higher
  132. Figure 6-35 Relay Board (6600-0214-850) Revision Level 9 or Lower
  133. Wiring Diagrams
  134. Figure 6-37 Wiring Diagram: Elevating Base
  135. Figure 6-38 Wiring Diagram: Electrical Enclosure
  136. Figure 6-39 Wiring Diagram: Graphics Display
  137. Figure 6-40 Wiring Diagram: Incubator Heater, Relay Board Rev. Level 10 or Higher
  138. Figure 6-41 Wiring Diagram: Incubator Heater, Relay Board Rev. Level 9 or Lower
  139. Figure 6-42 Wiring Diagram: Incubator Fan and Sensor
  140. Figure 6-43 Wiring Diagram: Servo Humidifier, Relay Board Rev. Level 10 or Higher
  141. Figure 6-44 Wiring Diagram: Servo Humidifier, Relay Board Rev. Level 9 or Lower
  142. Figure 6-45 Wiring Diagram: Servo Control Oxygen
  143. Appendix B: Specifications
  144. B.4 Operating Environment
  145. B.8 Performance
  146. B.9 Weight Scale
  147. Appendix C: RS-232 Serial Data
  148. C.3 Nurse Call
  149. Appendix D: Additional Safety Information
/ 206
Related manuals for GE Giraffe
GE 32563 Manual first page preview
GE 32563 Manual
GE 19211 Manual first page preview
GE 19211 Manual
GE 19298 User Manual first page preview
GE 19298 User Manual
GE 45130 User Manual first page preview
GE 45130 User Manual
GE ZW6305 Manual first page preview
GE ZW6305 Manual
GE DPS 5000 Series User Manual first page preview
GE DPS 5000 Series User Manual
GE IMRSEN-W12 Manual first page preview
GE IMRSEN-W12 Manual
GE PowerBank M540 Manual first page preview
GE PowerBank M540 Manual
GE 60 Series Installation Instructions Manual first page preview
GE 60 Series Installation Instructions Manual
GE JASCO 32563 Quick Start Manual first page preview
GE JASCO 32563 Quick Start Manual
This manual is suitable for:
Giraffe