16Before the eNB is installed at its final destination, perform the steps in sections 3.5 and 3.6.Upon successful testing, the eNB will be ready for installation at the cell site. Seal andweatherproof all the connection points, and rustproof where needed.3.5 Power on to Check LED StatusPower on the eNB, and check that the LED indicators are lighting as expected: Power is steadygreen, CELL1 and CELL2 are slow flash green, and there are no alarms (Figure 3–10, Table 2-2).Figure 3–10: Check LEDs3.6 Configure Basic ParametersReference: Baicells Configuration & Network Administration GuideThe Nova-436Q eNB may be configured in Single Carrier, Single Carrier with CarrierAggregation (CA), or HaloB mode. When first installing and testing the Nova-436Q, Baicellsrecommends configuring the standard single carrier settings (without enabling CA or HaloB)for simple verification that the new eNB is operational.3.6.1 Launch the eNB GUIFollow the steps below to connect to the GUI.Step 1: Use an Ethernet cable to connect the eNB DATA port to the local networkrouted to the internet. The DATA interface is set to DHCP client by default.Optionally, you can plug a pc directly into the eNB MGMT port. On your pc you willneed to assign a static IP address within the MGMT subnet. The default IP addressfor the MGMT interface is http://192.168.150.1/24.Step 2: Open a Web browser, and enter the following IP address: http://192.168.150.1Step 3: At the login screen (Figure 3-16), enter the default user name (admin) andpassword (admin) and click on Login to open the home page (Figure 3–11).Figure 3–11: GUI Login