41Module Assembly Key Point - Optical Engine1. Light Pipe Module assembly and overfill alignment1.1 Assembly LP Module to HSG DMD(1) Assembly two Overfill adjustment screws to HSG DMD (Fig. 1-1).** Adjustment criteria refer to below item(2) Assembly “Clip LP” and lock with screw well (Fig. 1-2).(3) Press CLIP of RE_BKT_LP first, and then push it into the hole (Fig. 1-3).(4) Placed LP Module on LP datum of “DMD HSG” and adjustment screw well (Fig.1-4).(5) Assembly “Baffle LP” first (Fig. 1-5-1) & push “Baffle LP” to hook DMD HSG, and thenlock with screw well (Fig. 1-5-2).1.2 Overfill Adjustment @ LP ModuleOverfill Adjustment Criteria:(1) Pre-assembly 2 adjusting screws. Criteria shown as Fig.1-6.(2) Alignment Sequence:a. To adjust “Horizontal Adjustment Screw” firstly, and then “Vertical AdjustmentScrew”.b. Refer to Fig. 1-6.(3) For Overfill Re-adjustment:a. Those 2 Adjustment Screws must be released closely to the “Pre-assembly”positions first.b. Follow adjustment steps shown in Item 1.2.Fig. 1-1 Fig. 1-2Overfill VerticalAdjustment ScrewOverfill HorizontalAdjustment ScrewClip LP