OneStart

ABB ACS880-11 Hardware Manual

Also see for ACS880-11: ManualSupplementApplication guideFirmware manualInstallation

Page 1 preview
Page 2 preview
Page 3 preview
Page 4 preview
Page 5 preview
Page 6 preview
Page 7 preview
Page 8 preview
Page 9 preview
Page 10 preview
Page 11 preview
Page 12 preview
Page 13 preview
Page 14 preview
Page 15 preview
Page 16 preview
Page 17 preview
Page 18 preview
Page 19 preview
Page 20 preview
Page 21 preview
Page 22 preview
Page 23 preview
Page 24 preview
Page 25 preview
Page 26 preview
Page 27 preview
Page 28 preview
Page 29 preview
Page 30 preview
Page 31 preview
Page 32 preview
Page 33 preview
Page 34 preview
Page 35 preview
Page 36 preview
Page 37 preview
Page 38 preview
Page 39 preview
Page 40 preview
Page 41 preview
Page 42 preview
Page 43 preview
Page 44 preview
Page 45 preview
Page 46 preview
Page 47 preview
Page 48 preview
Page 49 preview
Page 50 preview
Page 51 preview
Page 52 preview
Page 53 preview
Page 54 preview
Page 55 preview
Page 56 preview
Page 57 preview
Page 58 preview
Page 59 preview
Page 60 preview
Page 61 preview
Page 62 preview
Page 63 preview
Page 64 preview
Page 65 preview
Page 66 preview
Page 67 preview
Page 68 preview
Page 69 preview
Page 70 preview
Page 71 preview
Page 72 preview
Page 73 preview
Page 74 preview
Page 75 preview
Page 76 preview
Page 77 preview
Page 78 preview
Page 79 preview
Page 80 preview
Page 81 preview
Page 82 preview
Page 83 preview
Page 84 preview
Page 85 preview
Page 86 preview
Page 87 preview
Page 88 preview
Page 89 preview
Page 90 preview
Page 91 preview
Page 92 preview
Page 93 preview
Page 94 preview
Page 95 preview
Page 96 preview
Page 97 preview
Page 98 preview
Page 99 preview
Page 100 preview
Page 101 preview
Page 102 preview
Page 103 preview
Page 104 preview
Page 105 preview
Page 106 preview
Page 107 preview
Page 108 preview
Page 109 preview
Page 110 preview
Page 111 preview
Page 112 preview
Page 113 preview
Page 114 preview
Page 115 preview
Page 116 preview
Page 117 preview
Page 118 preview
Page 119 preview
Page 120 preview
Page 121 preview
Page 122 preview
Page 123 preview
Page 124 preview
Page 125 preview
Page 126 preview
Page 127 preview
Page 128 preview
Page 129 preview
Page 130 preview
Page 131 preview
Page 132 preview
Page 133 preview
Page 134 preview
Page 135 preview
Page 136 preview
Page 137 preview
Page 138 preview
Page 139 preview
Page 140 preview
Page 141 preview
Page 142 preview
Page 143 preview
Page 144 preview
Page 145 preview
Page 146 preview
Page 147 preview
Page 148 preview
Page 149 preview
Page 150 preview
Page 151 preview
Page 152 preview
Page 153 preview
Page 154 preview
Page 155 preview
Page 156 preview
Page 157 preview
Page 158 preview
Page 159 preview
Page 160 preview
Page 161 preview
Page 162 preview
Page 163 preview
Page 164 preview
Page 165 preview
Page 166 preview
Page 167 preview
Page 168 preview
Page 169 preview
Page 170 preview
Page 171 preview
Page 172 preview
Page 173 preview
Page 174 preview
Page 175 preview
Page 176 preview
Page 177 preview
Page 178 preview
Page 179 preview
Page 180 preview
Page 181 preview
Page 182 preview
Page 183 preview
Page 184 preview
Page 185 preview
Page 186 preview
Page 187 preview
Page 188 preview
Page 189 preview
Page 190 preview
Page 191 preview
Page 192 preview
Page 193 preview
Page 194 preview
Page 195 preview
Page 196 preview
Page 197 preview
Page 198 preview
Page 199 preview
Page 200 preview
Page 201 preview
Page 202 preview
Page 203 preview
Page 204 preview
Page 205 preview
Page 206 preview
Page 207 preview
Page 208 preview
Page 209 preview
Page 210 preview
Page 211 preview
Page 212 preview
Page 213 preview
Page 214 preview
Page 215 preview
Page 216 preview
Page 217 preview
Page 218 preview
Page 219 preview
Page 220 preview
Page 221 preview
Page 222 preview
Page 223 preview
Page 224 preview
Page 225 preview
Page 226 preview
Page 227 preview
Page 228 preview
Page 229 preview
Page 230 preview
Contents
  1. Table Of Contents
  2. Table Of Contents
  3. Table Of Contents
  4. Table Of Contents
  5. Table Of Contents
  6. Table Of Contents
  7. Table Of Contents
  8. Table of contents
  9. Safety instructions
  10. General safety in installation, start-up and maintenance
  11. Electrical safety in installation, start-up and maintenance
  12. Additional instructions and notes
  13. Grounding
  14. Additional instructions for permanent magnet motor drives
  15. General safety in operation
  16. Contents of this chapter
  17. Quick installation and commissioning flowchart
  18. Related documents
  19. Operation principle
  20. Layout
  21. Overview of power and control connections
  22. Control panel
  23. Type designation label
  24. Type designation key
  25. Examining the installation site
  26. Required tools
  27. Unpacking and examining delivery
  28. Installing the drive
  29. Flange mounting (option +C135)
  30. North American Market
  31. Requirements table
  32. Additional requirements for ABB high-output and IP23 motors
  33. Additional data for calculating the rise time and peak line-to-line voltage
  34. Additional note for sine filters
  35. Typical power cable sizes
  36. Alternative power cable types
  37. Not allowed power cable types
  38. Conduit
  39. Signals in separate cables
  40. Routing the cables
  41. Separate control cable ducts
  42. Implementing thermal overload and short-circuit protection
  43. Protecting the drive against ground faults
  44. Declaration of Conformity
  45. Using a contactor between the drive and the motor
  46. Implementing a motor temperature sensor connection
  47. Drive I/O, I/O extension and encoder interface modules
  48. Grounding the motor cable shield at the motor end
  49. Checking the compatibility with IT (ungrounded) and corner-grounded delta systems
  50. TT systems
  51. Disconnecting internal EMC filter and ground-to-phase varistor –frame R8
  52. Connecting the power cables
  53. Connection procedure
  54. R8 power cable connection if you detach the connectors
  55. Connecting the control cables
  56. Default I/O connection digram
  57. Notes
  58. AI1 and AI2 as Pt100, Pt1000, PTC and KTY84 sensor inputs (XAI, XAO)
  59. Drive-to-drive link (XD2D)
  60. DI6 (XDI:6) as PTC sensor input
  61. Installing option modules
  62. Wiring option modules
  63. Installation of safety functions modules
  64. Installation next to the control unit on frames R6 and R8
  65. Reinstalling cover(s)
  66. Connecting a PC
  67. Controlling several drives through the panel bus
  68. Input power cable
  69. Description of symbols
  70. Heatsink
  71. Replacing the main cooling fan, frame R3
  72. Replacing the main cooling fan, frame R6
  73. Replacing the main cooling fan, frame R8
  74. Replacing the auxiliary cooling fan, IP55 (UL Type 12) frame R3
  75. Replacing the auxiliary cooling fan, frame R6
  76. Replacing the auxiliary cooling fan, frame R8
  77. Replacing the second auxiliary cooling fan IP55 (UL Type 12), frame R8
  78. Capacitors
  79. Replacing the memory unit
  80. LEDs
  81. UL (NEC) ratings
  82. Definitions
  83. Ambient temperature derating, IP21 (UL Type 1)
  84. Ambient temperature derating, IP55 (UL Type 12)
  85. Ambient temperature derating in table format
  86. Deratings for special settings in the drive control program
  87. High speed mode
  88. Altitude derating
  89. Fuses (IEC)
  90. Fuses (UL)
  91. Dimensions, weights and free space requirements
  92. Losses, cooling data and noise
  93. Terminal and entry data for the power cables
  94. UL listed cable lugs and tools
  95. Electrical power network specification
  96. Motor connection data
  97. Control unit (ZCU-12) connection data
  98. Efficiency
  99. Applicable standards
  100. Ambient conditions
  101. CE marking
  102. Compliance with the European ROHS II Directive
  103. Compliance with the EN 61800-3:2004 + A1:2012
  104. Category C3
  105. Category C4
  106. UL marking
  107. China RoHS marking
  108. R3, IP21 (UL Type 1)
  109. R3 – Option +B056 (IP55, UL Type 12)
  110. R6, IP21 (UL Type 1)
  111. R6 – Option +B054 (IP55, UL Type 12)
  112. R6 – Option +B056 (IP55, UL Type 12)
  113. R8 – Option +B056 (IP55, UL Type 12)
  114. What this chapter contains
  115. Compliance with the European Machinery Directive
  116. Single drive (internal power supply)
  117. Multiple drives (internal power supply)
  118. Multiple drives (external power supply)
  119. Wiring examples
  120. Start-up including acceptance test
  121. Maintenance
  122. Competence
  123. Safety data (SIL, PL)
  124. Abbreviations
  125. du/dt filter types
  126. Description, installation and technical data
  127. Product and service inquiries
/ 230
Related manuals for ABB ACS880-11
ABB ACS880-17 Hardware Manual first page preview
ABB ACS880-17 Hardware Manual
ABB ACS880-04 Hardware Manual first page preview
ABB ACS880-04 Hardware Manual
ABB ACS880-01 Hardware Manual first page preview
ABB ACS880-01 Hardware Manual
ABB ACS880-07 Hardware Manual first page preview
ABB ACS880-07 Hardware Manual
ABB ACS880-37 Hardware Manual first page preview
ABB ACS880-37 Hardware Manual
ABB ACS880-01 Hardware Manual first page preview
ABB ACS880-01 Hardware Manual
ABB ACS880-07 Hardware Manual first page preview
ABB ACS880-07 Hardware Manual
ABB ACS880-37 Hardware Manual first page preview
ABB ACS880-37 Hardware Manual
ABB ACS800 Hardware Manual first page preview
ABB ACS800 Hardware Manual
ABB ACS800 Hardware Manual first page preview
ABB ACS800 Hardware Manual
This manual is suitable for:
ACS880-11