ABB NGC8206 manuals
NGC8206
Brand: ABB | Category: Measuring Instruments
Table of contents
- Table Of Contents
- Table Of Contents
- Table Of Contents
- Table Of Contents
- Table Of Contents
- Table Of Contents
- Table Of Contents
- Table Of Contents
- Table Of Contents
- Table Of Contents
- Table Of Contents
- System Overview
- Figure 2-1 Typical Single Stream Installation
- Figure 2-2 Typical Multi-Stream Installation
- Processing a Sample
- Hardware System Specifications
- NGC8206 Standard Hardware Features
- Recommended Spare Parts
- Figure 2-4 NGC8206 Enclosure
- Feed-through Assembly
- Analytical Module
- Figure 2-9 Analytical Module
- Figure 2-10 Manifold Assembly
- Figure 2-11 Analytical Processor Assembly
- Digital Controller Assembly with VGA Display
- Figure 2-14 NGC VGA Display Screen
- Termination Panel
- Grounding the NGC
- Power Supply
- Operating Voltages and Cable Lengths
- Sample Transport Tubing Design
- Gas Volume in Transit Tubing
- Heat Tracing Sample Lines
- Calculations
- NGC8206 Standard Software Features
- Calculation Options
- NGC Start-Up Diagnostics
- Start-Up Wizard
- Audit Logs
- Location
- Figure 2-20 ENC82L Environmental Enclosure with Electric Heater
- Figure 2-21 ENC82L Environmental Enclosure with Catalytic Heater
- Optional Features
- Gas Types
- Mounting Brackets
- Figure 2-26 Single Stream Conditioning Module Dimensions
- Security Seal (Optional Equipment)
- Optional Equipment Enclosure
- VAC UPS Power Option (24 VDC Systems Only)
- Explosion-Proof Power Supply (Optional Equipment)
- Figure 2-32 Explosion-Proof AC Power Supply
- Overview
- Locating Area for Installation
- Installation
- Unpacking and Inspection
- Unpacking
- Stand Alone Installation
- Material required
- Figure 3-5 ENC82L–Enclosure Stand Installation
- Small Free-standing Environmental Enclosure Installation
- Figure 3-7 ENC82S–Enclosure Installation
- Large Pipe-Mounted Environmental Enclosure Mounting Kit
- Figure 3-9 ENC82L–Mounting Brackets
- Figure 3-12 ENC82L–Pipe Mount installation
- Optional Support Leg Kit Installation
- Small Pipe-Mounted Environmental Enclosure Mounting Kit
- Figure 3-15 ENC82S–Channel Tubing Installation
- Figure 3-17 ENC82S– Pipe Mount Assembly
- Pipe Saddle Installation
- Shelf Installation
- NGC Installation
- Sample Conditioning Module Installation
- Mounting Kits
- Sample Line Connections
- Figure 3-25 Sample Conditioning Module Line Connections
- Sample Line(s) to NGC Inside of ENC82
- Instructions
- Figure 3-27 ENC82S–Environmental enclosure Sample Boot
- ENC82L Optional Pwr/Comm Outlet Box Assembly
- Figure 3-28 Power Communication Outlet Box Assembly
- Figure 3-29 ENC82L Large Enclosure
- Figure 3-30 Assembled Power/Communication Assembly
- Figure 3-31 Power Wiring Diagram
- Figure 3-32 Suggested RS-232 Wiring Instructions
- Carrier/Calibration Bottle Rack Installation on Meter Run
- Figure 3-36 Dual Bottle Rack Assembly
- Figure 3-38 ENC82S–Dual Bottle Rack Installation
- Carrier Gas Regulator Installation
- ENC82L Calibration Gas Bottle Installation
- ENC82S Calibration Gas Bottle Installation
- Calibration Gas Regulator Installation
- Figure 3-43 Calibration Gas Pressure Regulator with Relief Valve
- Carrier Gas and Calibration Gas Connections
- Vent Lines Connections
- ENC82L Optional Catalytic Heater Installation
- Figure 3-47 Catalytic Heater Option in Environmental Enclosure
- Figure 3-49 Thermostat Assembly Installed
- Figure 3-51 Temperature Probe Installation
- ENC82S Optional Catalytic Heater Installation
- ENC82 Optional Electric Heater Installation
- Figure 3-57 Electric Heater Option Wiring Instructions
- Sealing Environmental Enclosure
- Enclosure
- Figure 3-59 6200 Enclosure Pipe-Mounting Installation
- Wall Mount Instructions
- Figure 3-62 6200 Enclosure Wall Mounted Installation
- VAC UPS Power Supply (24 VDC Systems)
- VAC to 12 VDC Explosion-Proof Power Supply Installation
- Customer Supplied Materials
- VAC to 12/24 VDC Power Supply Installation
- Figure 3-69 6200 Optional Equipment Enclosure with Power Supply
- VDC to 12 VDC Power Converter
- Battery Pack Installation
- Figure 3-75 Battery Pack with DC Power Supply Wiring Instructions
- Solar Panel Installation
- Figure 3-78 12 VDC Battery Pack/Solar Panel Wiring Instructions
- Figure 3-79 24 VDC Battery Pack/Solar Panel Wiring Instructions
- DC Power Installation
- PCCU32 Installation and Setup
- Ethernet Installation and Setup
- Figure 4-2 Ethernet Cable-Typical
- TCP/IP Local Connection
- Connecting to the NGC8206 Local Port
- NGC Diagnostics
- NGC Start-Up Wizard
- Stream Setup Instructions
- Diagnostics
- Start-up Completion
- Figure 4-5 Typical Chromatograph for Chrom-1 (Heavies)
- Security System
- Alarm Definitions
- Spare Part Components
- Figure 5-1 NGC8206 Overall View
- Figure 5-2 Analytical Module, Exploded
- Repair Time
- Field Tool Kit
- Backing Up Configuration Files (Save)
- Restore Factory Defaults
- Changing NGC Clock
- Replacing Digital Controller Complete Assembly
- Figure 5-5 Digital Controller Board
- Replacing Analytical Module
- Figure 5-6 Analytical Module
- Replacing GC Module
- Figure 5-8 GC Module, Exploded View
- Replacing Termination Panel
- Figure 5-9 Termination Panel
- Replacing Feed-through Assembly
- Figure 5-10 Feed-Through Assembly
- Replacing Lithium Battery
- Replacing Frit Filters
- Figure 5-12 Feed-through Assembly, Exploded View
- Replacing Feed-through Interface Gasket
- Replacing Termination Panel to Digital Controller Cable
- Replacing Analytical Processor to Termination Panel Cable
- Start-Up Diagnostic Troubleshooting
- Status
- Oven Temperature Test
- Processor Control Test
- Troubleshooting Alarms
- Operators
- Alarm Severity
- Sample Pressure Alarm
- Oven Temperature Error Alarm
- No Stream Valve Selected
- Calculation Error Alarm
- Stream Sequence Error Alarm
- Calibration RF Percent Error Alarm
- Enclosure Temperature Alarm
- Low Carrier Gas Bottle (DI1) Alarm
- GCM Processing Error Alarm
- Sample Flow Detection Alarm
- RAM File Available Alarm
- Stream Un-Normalized Total
- Alarm Troubleshooting Tests
- Feed-through Assembly Blockage Test
- Figure 6-2 Power Troubleshooting Flowchart
- Power Supply Voltage Test
- NGC Module Isolation Test
- Charger Circuit Test
- Solar Panel Troubleshooting Test
- AC Charger/Power Supply Troubleshooting Test
- Communication
- Transceiver Supply Voltage Test
- Transceiver Check
- RS-485 Communications
- RS-485 Communication Test
NGC8206
Brand: ABB | Category: Laboratory Equipment