How to connect Antenna Units (AU) to the Hub (HU)CAUTION Electrostatic discharge (ESD) preventative measures (i.e. wrist straps, useof ESD protective bags) should be taken when storing, transporting and handlingSFPs as voltages in excess of 50V can cause damage to the device.Hold the SFPs by the metal body and insert it into the designated HU and AU opticalslots. An audible click can be heard when the SFP is fully latched. Ensure that thede-latch bail is in the upright position.Figure 15Removal of the SFP is achieved by extending the de-latch bail and pulling it awayfrom the unit.Figure 16Remove the protective end caps and connect the patch cord between the SFP on theHU (Figure 11) and the local end of the Installed Fibre and between the remote endof the Installed Fibre and the SFP on the AU. (Figure 12)The optical connectors arekeyed and care must be taken when inserting them.Figure 17 Figure 18NOTE Using patch cords other than those specified by ZinWave can affect theoverall performance of the system.Issue 3 Page 14 of 31 15/11/2006